ML19261A654

From kanterella
Jump to navigation Jump to search
Bessemer Has Advised Util That Delay in Replacing Shafts & Springs Which Drive Governors Is Beneficial Until Inlet & Exhaust Valve Crosshead Assemblies Are Replaced,Per Deficiency Rept 10
ML19261A654
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/29/1978
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LPL-10343, NUDOCS 7902050289
Download: ML19261A654 (2)


Text

y LaulslANA , .22p 0amcseme POW E A & L1G H T/ 6cx 60cc * :W GRL M.5 >.0Uis: Au A 701 'd E0 0 3Et-2345 MiccLescuTs UTIUTE5 5 v STEM O. L A 3'A E',t December 29, 1978 ,,.m.,.,,,,,%,

LPL 10243 Q a- A3 5. 07. 06 3- Al.01. 04 Mr. K. V. Seyfrit, Director, Region IV U.S. Nuclear Regulatory Co==ission Office of Incpection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Ar)ington. Texas 76012

SUBJECT:

Waterford SES L' nit 3 Docket No. 50-332 Status of Significant Construction Deficiency No. 6 " Emergency Die M G a -- n< ce +- 4 e .

% W - -- d e- -i- -. ."

REFERENCE:

LPL lecter 9331 dated August 17, 1978

Dear Mr. Seyfrit:

As stated in the referenced letter, correct;.ve action t:0 m pl:n:e the ::ha f t s whicit drive the engine speed control goverc.ar acc engine over. ced ,i m t d t . vin governor was scheduled to be completed by 2 aptember 30, 1978. 'om. r ihr u cta. : .

has advaed as that it .;euld be beneficial o dalay caplanine oc cn :1 t , a t.d aprings until they replace the inlet and ern,mst valve crosshu.nl as<:er'bli es required by Significant Deficiency Repo rt 30. 10 (ref. LPL 10233 t o K.V. Seyf :

dated December 5, 1978). In this way all the mcdificationa couJ.d be done at once. This request by Cooper-Bessemer is cceptable for c. a t e'- f o r d 1 ba s e d or, our construction needs.

For your information and based on discussn u n th Cooper -3ess n er personne.l .

it is our understanding that work to repla. ne sub;"ct ' haft. 'md ::pringn has not been completed at any otner locat1 w.

As discussed with your personnel, we will r.ow cuo=1L the final report for Significant Deficiency No. 6 by August 31, ' '> 7 9 - the n ee date aa has heci, coc mitted for Si gnificant Defic.lency No. 1.

790205 DEt 7

Mr. K.V. Seyfrit 2 December 29, 1978 Yours very truly, A s D.L. Aswell DLA/TFG/ys Enclosure cc: 1) Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (with 15 copies of report)

2) Director Of fice of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (with one copy of report)