Interim Deficiency Rept Re Reactor Blg Spray Piping Supports.Six Anchors Shown to Have Stresses Approx 6% Over Code Allowables in Coorespondence W/Itt Grinnell.Condition Exists at Weld Joint Between Anchor & Support
ML19261A628
Person / Time
Site: Midland
Issue date: 02/01/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
HOWE-36-79, NUDOCS 7902050219
Download: ML19261A628 (2)


Text

.

8< %' Censumers

.;;;g)

LA4 l POWar

' O ,M./

Stephen H. Howell s Senior Vice Fesulent General Of fices: 1945 West Parnail Road, Jackson. Michigan 49201 (517) 788 0453 February 1, 1979 Hove-36-79 Mr J G Kepplcr, Regional Director office of Inspection and Inforcement US IIuclear Regulatory Coraission Regica III 799 Roocevelt acad Glen Ellyn, IL 60137 MIDLA:iD IiUCLEAR PLA:iT UNIT I;01, ECCKET I:0 50-329 U:IIT ??O 2, EOC I'I' ::0 50-330 IEACTOR SUILDI':C SPRAY PIPI' G SUPPOPS'S

Reference:

S E Howell letters to J G Keppler; Midland IIuclear Plant; Unit IIo 1, Docket Ito 50-329; Unit :To 2, Docket I o 50-330; Reactor 3cilding Spray Piping Supports -

1) Serial Heve-60-78, dated April 19, 1978
2) Serial Hove-92-78, dated June 13, 1978
3) Serial Ecue-154-78, dated August 30, 1978 h) Serial Hove-lc6-78, dated October 13, 1978
5) Serial Heve-231-78, dated IIovember'10,1978
6) Serial neve-265-78, dated December 15, 1978 The referenced letters and this letter are interin 50 55(e) reports. In reference 1 it was reported that the local pipe stresses at the point of the ancher attach =cnt to ;ne spray piping may exceed Ccde allevables. In reference 6, it was reported that the expected result of the evaluation vould be that the reactor building spray anchors and system piping vculd be utilized as is in that the allevable stresses vould not be exceeded.

Recent correspondence frcm ITT Grinnell revealed that six anchors, for each unit, have been shcun to have stresses approximately 6% over Code allowables . This ecndition exists at the veld joint between the anchor and the Bechtel supplied structural suppcrt extending frcm the ecntainment dcme. The previcusly determined actual time history water ha=er lcadinE curves will new be applied to =cre closely provide the actual leadings that veuld be experienced by the anchors still in cuestion. As reported in references 4 and 5, an enclysis in accordance with AS"Z Section III, Appendix F is not being pursued.

5Q

\

790205o219

2 Howe-36-79 Another report, either interi:n or final, vill be sent on or before March 23, 1979 ~

. ,-a g .(_ cot c~ ^

CC: Director of Office of Inspection & Enforce =ent Att: Mr John G Davis, Acting Director, USIIRC (15) e Director of Office of Management Information & PrcGram Control, USITRC (1) e