7 CONNECTtCUT YANKEE AT O M I C POWER C, O M P A N Y
,dll ' \\i HERLIN. CONNECTICUT s
P. O GOK 270 H ARTFORD. CON N ECTICUT 06101 T
20366669t1 1;EE-79-E-047 Januar'/ 15, 1979 Fir. Boyce Grier, Director Region 1 Office of Inspecti.in and Enforcement U.S. ;;uclear Regul, tory Connission 631 Park Avenue King of Prussia, Pennsylvania 19'406
Reference:
Facility Operating License I;o. DPR-61 Dochet ;;o. 50-213 1:TS-! R/50-213 / 7 8-16 Dent !!r. Grier:
Pursuant to Connecticut Yankee Enviranzental Technical Specifications (ETS), Sectica 3.1.1.), Ccmnecticut Ycchec l.tenic Pc er Company i.ereby forwards the following report regarding fish impingement overruns.
an estimated During power operations with four main circulators running, 39 bluegill, Lcpc='a rucrochirua, length ca te r.ory 3-6", were impin;;cd dur-ing July of 1978, exceeding the conthly limit of 23 as established by ETS Tabic 3.1-1.
for this occurrence which could be related to There was no apparent cause changes in plant operations.
The inadvertent delay in submittal of the letter as required by ETS section S.6.2.a.2 resulted from a clerical error comparing estimated conthly totals against the fish impingement report limits established by ETS Table 3.1-1.
It is felt, however, th a t this esticated impingement total for July is emall and does not represent a significant environmental impact.
Very truly yours,
/N R.11. Graves Station Superintendent PFf3/ngt Director, Of fice of t;uclear Reactor Regulation, b'ashington, D.C.