Transmittal of La Crosse Boiling Water Reactor Final Status Survey (FSS) Final Report - Phase 1
ML19261A357
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 09/11/2019
From: Gerard van Noordennen
La CrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LC-2019-0040
Download: ML19261A357 (3)


Text

~

LACROSSESOLU110NS September 11, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Final Status Survey (FSS) Final Report - Phase 1 LC-2019-0040 The La Crosse Boiling Water Reactor (LACBWR) Restoration Project License Termination Plan (L TP) describes the process of releasing land for unrestricted use. L TP Section 5.11 states that the FSS Final Report will be provided to the NRC in phases as remediation and FSS are completed with related portions of the site. contains the LACBWR Restoration Project FSS Final Report - Phase 1. The Phase 1 FSS Final Report encompasses open land areas, excavations and structure basements. The report specifically addresses four (4) sub-grade excavation survey units, three (3) open land survey units, and two (2) structure basement survey units. The report contains a compilation of all nine (9) Release Records that are within the Phase 1 scope.

To minimize the incorporation of redundant historical assessment and other FSS program information, and to facilitate potential phased releases from the current license, FSS Final Reports will be prepared in a phased approach. LACBWR estimates that a total of three (3) FSS Final Reports will be generated and submitted to the NRC during the decommissioning project.

LACBWR hereby requests the NRC review the attached Phase 1 FSS Final Report for acceptance of this portion of the site final radiological survey by January 9, 2020.

There are no regulatory commitments contained within this letter.

If you have any questions about this letter, please contact me at (860) 462-9707.

Respectfully, GM-4~~~

Gerard van Noordennen Vice President Regulatory Affairs S460 I State Highway 35, Genoa, WI 54632

LaCrosseSolutions LC-2019-0040 Page 2 of 2 Attachments: - Final Status Survey Final Report - Phase 1 - Preflight Report for Enclosure 1

Enclosures:

CD contains electronic files of Final Status Survey Final Report - Phase 1 and supporting documents.

cc:

Marlayna Doell, U.S. NRC Project Manager Regional Administrator, U.S. NRC, Region III Barbara Nick, President and CEO, Dairyland Power Cooperative Cheryl Olson, ISFSI Manager, Dairyland Power Cooperative Lane Peters, Dairyland Power Cooperative Service List (Cover letter only, no attachments and enclosure)

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP and Chief Nuclear Officer Reactor D & D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI54632-8846 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53 707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C.

44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004