| Issue date: | 11/22/1978 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Beaton GENERAL ELECTRIC CO. |
| Shared Package | |
| ML19261A293 | List: |
| References | |
| REF-QA-99900403 NUDOCS 7901050099 | |
| Download: ML19261A292 (2) | |
Text
.
[e "ECg\\
n UN!TE D STATES T4UCLE AR REGULATORY COMMISSloN
[ $
k REGION IV 3, g,,, [*,
f 6119Y AN PLAZA DRIVE, SUITE 1000 g -on.w /
.., p 3,, g;
.g
+....
Docket l'o.
99900403/78-04 General Electric Company fluclear Energy Business Group ATT!!:
Dr. R. H. Beaton Vice President and General Manager 175 Curtner Avenue San Jose, California 95125 Gentlemen :
This refers to the QA program inspection conducted by Mr. J. R. Costello of this office on October 30 - November 3,1978, of your facility at San Jose, California, and to the discussions of our findings with Mr. J. Barnard and mer.bers of your staff at the conclusion of the inspection.
Areas examined during the QA program inspection and our findings are discussed in the enclosed rept.,rt.
Withir these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA pro': ram failed to meet certain conmitments in your Topical Report No.
NED0-11209-04A. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measure; were or will be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such informaticn from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and 2901050@6Pf
General Electric Company Nuclear Energy Business Group should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
' G, i
(C c-id 52 Uldis Potapovs, Chjef Vendor Inspection Branch Enclosures :
1.
Notice of Deviation 2.
Inspection Report No. 99900403/78-04
.