ML19260F146

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-0025/82-06 on 820712-16 & 19-23. No Noncompliance Noted.Major Areas Inspected:Measurements Control plan,shipper-receiver Verification,Internal Control & Mgt of Matl Control.Details Withheld (Ref 10CFR2.790)
ML19260F146
Person / Time
Site: 07000025
Issue date: 08/19/1982
From: Nelson G, Norderhaug L, Wieder A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19260F145 List:
References
70-0025-82-06, 70-25-82-6, NUDOCS 8208270363
Download: ML19260F146 (1)


Text

.

The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790. ~

U.S. NUCLEAR REGULATORY COMMISSION Region V Report No. 70-25/82-06 (IE-V-507)

Docket No. 70-25 License No.

SNM-21 Safeguards Group 1

Licensee:

Energy Systems Group, Rockwell International 8900 De Soto Avenue Canoga Park, California 91304 Facility Name:

Energy Systems Group, Atomics International Division Inspection at:

De Soto Facility and Rockwell International Hot Laboratory Inspection Conducted: July 12-16 and 19-23,1982 Date of Last Material Control and Accounting Inspection Visit:

March 1-2 and 15-19,1982 Type of Inspectio :

Unannounced, Material Control and Accounting Inspectors:

/

f L

n.

V.

wieder, bareguards nuditor D6te Signed f:.ldb<e#

$- /9- @/2

/

' 6. 6. Nelson, bat eguards cneanst Date Signed Date Signed s

///

2__

Approved by:k,' R'.{No#Je(^hau(f;-6niefAf;;s;iTJs Branch

-e ec

~

D8te Signed Inspection Sun.; nary:

Areas Inspected: Routine safeguards inspection of f acilities organization, measurement control plan, shipper-receiver verification, internal control, records and reports, management of material control and independent safeguards inspection effort. The inspection involved 63 inspector-hours onsite by two inspectors.

R_esu lt s :

There were no items of noncompliance within the seven areas inspected.

8208270363 820820 PDR ADOCK 070000,75 C

PDH