ML19260E290

From kanterella
Jump to navigation Jump to search
Responds to NRC 791206 Ltr Re Violations Noted in IE Insp Rept 50-358/79-32.Corrective Actions:Issued Design Document Change SLS-483 to Permit Installation of A-588 or a 572 Grade 50 Steel on 50 Ksi Matl
ML19260E290
Person / Time
Site: Zimmer
Issue date: 01/11/1980
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19260E289 List:
References
QA-1247, NUDOCS 8002150153
Download: ML19260E290 (2)


Text

.

p.I "

L- (

sEl THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATI.OMIO 4520s v bt a t January 11, 1980 QA-1247 U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. James G. Keppler, Director RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT I IE INVESTIGATION REPORT #79 DOCKET NO.

50-358, CONSTRUCTION PERMIT CPPR-88, W.0. 457300-957, JOB E-5590 Gentlemen:

This letter constitutes our formal reply to the subject investigation report.

It is our opinion that nothing in the report or in this reply is proprietary in nature.

Our response to the item of noncomplunce identified in Appendix "A" of the report is as follows:

Corrective Action Taken and Results Achieved Henry J. Kaiser Company Nonconformance Report (NR) No. E-2147 was written to document the nonconforming condition. The Material Review Board has approved the " Accept-as-is" disposition and this NR has been closed.

Corrective Action Taken to Avoid Further Noncompliance Sargent & Lundy has issued Design Document Change (DDC) SLS-483 to permit installation of A-588 (Fy=50 ksi) or A-572 Grade 50 steel where 50 ksi material is noted on the Sargent & Lundy Drywell Steel Framing Drawings.

All Superintendents in charge of installation work have been instructed that requirements identifying size and grade material must be complied with or an authorized change must be obtained from our Architect-Engineer prior to implementing any deviation from a design document.

Additional Henry J. Kaiser Quality Control personnel have been assigned to this area to follow and inspect this work more closely to assure that the installation is in compliance with design requirements. Henry J. Kaiser QC personnel will completely verify the acceptability of materials utilized in the modification work in the Drywell.

J AN 131980 soosiso ,,/5j