Responds to IE Bulletin 79-14.Appropriate Response Not Possible at Present Stage of Const
ML19260E246
Person / Time
Site: Washington Public Power Supply System
Issue date: 09/07/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-14, NUDOCS 8002140253
Download: ML19260E246 (1)


Text

W F

eJu u P

W shington Public Power Supply System A JOINT CiPERATING AGENCY S

r. o. so...

3000 c,o.

w..~.

oro w.,

n.cau

o. w.,

. oro

..a s a e o~ (so.) avs.sooo September 7,1979 G01-79-476

, 7;CC4 Docket Nos. 50-460

/s

'm 50-513 p.,...,.g-cld ".,

Mr. R. H. Engelken U.S. Nuclear Regulatory Commission Region V 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, CA 94596

Subject:

UPPSS NUCLEAR PROJECTS NOS.1 & 4 IE BULLETIN 79-14

Dear Mr. Engelken:

We have reviewed the subject IE Bulletin and submit the following in response:

Item 1 of the subject bulletin does not apply due to the fact that the plants are still under constructirn.

Items 2 and 3 require inspection of installed piping systems for pipe run geometry, support type and location, pipe attachments, restraints, etc., to substantiate conformance to the seismic analysis input. At the present time, piping installation on WNP-l/4 has not progressed to the point where meaningful inspections can be made and an appropriate response to 79-14 is not possible at the present stage of construction.

It is certain that some reanalysis work will be required as construction progresses and the final as-built condition may differ from that utilized for seismic analysis. However, our design review process dictates that such differences be evaluated by the Design Engineer to substantiate that the validity of the related seismic analysis is not compromised.

Very truly yours, b!

D. L. RENBEkGER Assistant Director - Technology DLR:FJ:ds 80021402,Q,I