ML19260E230
| ML19260E230 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 01/31/1980 |
| From: | Oconnor P Office of Nuclear Reactor Regulation |
| To: | Ziemann E Office of Nuclear Reactor Regulation |
| References | |
| TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8002140200 | |
| Download: ML19260E230 (2) | |
Text
.
pn nacog'o UNITED STATES l ' 3.,, cf(',j NUCLEAR REGULATORY COMMISSION
// y c WASHINGTON, D. C. 20555 f
January 31, 1980 g,
....+
Docket No. 50-2if MEMORANDUM FOR: Dennis L. Ziemann, Chief Operating Reactors Branch #2, D0R FROM:
Paul W. O'Connor, SEPM Operating Reactors Branch #2, D0R
SUBJECT:
MEETING WITH YANKEE ATOMIC ELECTRIC COMPANY Date and Tine:
Monday February 4,1980 10:00 am Location:
Roon P-500 Phillips Building 7920 Norfolk Avenue Bethesda, MD.
Purpose:
To discuss Yankee Atomic's assessment of the seismic design capability of Yankee-Rowe (see attached tentative agenda).
Participants:
NRC P.W. O'Connor D.L. Ziemann T. Cheng C. Hoffmayer A. Burger P. Y. Chen K. Jabbour D. Crutchfield H. Levin YAEC J. Stacey J. Hoffman Earthquake Engineering Systems B. Kacyra, et al fa e.b Paul W. O'Connor, SEPM Operating Reactors Branch #2 Division of Operating Reactors
[
$0 Mh c
AGENDA FOR YANKEE ROWE SEISMIC REVIEW MEETING 1.
Introduction 2.- :YAEC presents preliminary study results A.
Description of modification schemes considered in study B.
Expected seismic load carrying capacity of each scheme C.
Major impact of each scheme 3.
NRC questions and comments on study 4.
Scope of further evaluations 5.'
Schedule for modifications 6.
Conclustion e
e a:e> -
o 5
e 9
MEETING NOTICE DISTRIBUTION Docket NRC PDR Local PDR ORB Reading NRR Reading H. Denton E. Case D. Eishenhut R. Vollmer D. Crutchfield L. Shao V. Noonan W. Ganmill A. Schwancer T. Ippolito R. Reid B. Grimes G. Lainas P. Check J. Miller R. Clark F. Pagano G. Knighton P. O'Connor OELD gjgE(3)
NRC Participants
. NSIC
\\ TERA ACRS (16)
PROC?AM SUPPORT BRANCH S. Sho.a
() ) {} M.,
5 %