05000338/LER-1980-012-03, /03L-0:on 800111,during Testing in Mode 3 to Verify Main Steam Trip Valve Closure Time,Trip Valve Failed to Close Fully within Required Five Seconds.Cause Unknown. Valve Was Retested.Closure Time within Acceptable Limits

From kanterella
(Redirected from ML19260D986)
Jump to navigation Jump to search
/03L-0:on 800111,during Testing in Mode 3 to Verify Main Steam Trip Valve Closure Time,Trip Valve Failed to Close Fully within Required Five Seconds.Cause Unknown. Valve Was Retested.Closure Time within Acceptable Limits
ML19260D986
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/08/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19260D983 List:
References
LER-80-012-03L, LER-80-12-3L, NUDOCS 8002120707
Download: ML19260D986 (1)


LER-1980-012, /03L-0:on 800111,during Testing in Mode 3 to Verify Main Steam Trip Valve Closure Time,Trip Valve Failed to Close Fully within Required Five Seconds.Cause Unknown. Valve Was Retested.Closure Time within Acceptable Limits
Event date:
Report date:
3381980012R03 - NRC Website

text

NRC FO"M 066 U. S. NUCLE AR R EcULATORY COwtMISSION

)

LICENSEE EVENT REPORT CONTROL BLOCC l l

l l

l l

l (PLE ASE PRii. OH TYPE ALL REQUIRED INFORMATION) i o

- l ol v g l 4 li 1l 1l 1l@l l

Ig vi Al Nl Al S i 1lglolol-l ol q ol ol 0 a

4 J

ucENm m i.

a uct. a Nm.48 e a

.4 uw.u n,E o

u-u CovT Z l ' l @ l g si q ol cl 3t 3 8lgl oi 1l 1l 1l aloglc;21ol 81 8l o]g o

i aEaCaTcATs 4J a

a e

OcxETNL m a u

o EveNrcari 74 EveN T cE;CHIPTICN AND PROB A8LE CCNSECUENCES h o;,

l During periodic testing in Mode 3 to verify main steam trip valve closure time TV-l l MS101A failed to fully close from the Train B control room pushbutton within the requiged u

a 5 second criterion.

Because the closure time of the trip valve was acceptable using l

o,4 the Train A pushbutton, the health and safety of the general public were not af fected. l g,s Reportable pursuant t o T. S. 6. 9.1. 9. b.

l o,4 0l7 l

l 314 l

ao d,

SYSTEM CALSE 1ALSE COY 8 VA LV E COOS CCCE StBCCCE CO'.'PONENT CODE SUSCODE SLSCOCE 06, I c ; o lg [xjg [ zjg l Vl Al Ll V E l X lQ [ Cg ] g 7

d 9

10 17 12 IJ 18 13 2')

SE OUE N TI A L oCOURAENCE R E *CR T R EVIS80N mar I

l 1

--I I

f 1

j, l C@,05 3l l L; j_l

q EVE'E < tar O 1 2 T

acPORTNO Tv88 N-O a'E Q L

AO 0

_ 21 a

2J 24

.6 27 24 29 3a 31 32 ACTION FUTymE EF8ECT SHUT 00WN A TT AC HV E N T NP404 PRl*,9E COMA COM PON E N T TAKE1 A CT40N O'(f L AN T YE HCD OU S SUB ITTED FO*'9348.

SVP*Le G R

  • 'A

'F A(TUR 8 H JJ Je b

36 3/

40 41 42 43 44 47 CAUSE CESCRIPTION AND CORRECTIVE ACTIONS h The cause of this discrepancy is not known.

An airline check valve was disassembled j

j, a

and inspected but no debris or binding was found.

The check valve was then reassembled;

,,,,j,

and retested from the Train B pushbutton which u :ulted in an acceptable c! Lsure time

[

of 4.3 seconds.

i A i l I

7 8 9 90 METHOO OF F aciLITY STAT S 80 ER OTHER STATUS OISCO ERY OLSCOv rRY OESCRIPTION Surveilliance Test 5Il

@l l

l l@l M l

l l@l g

1 44 45 46 go ACTW i fY TENT AEL 3E0 A

OUNT OF ACT1VITY LOCATION OF RELE ASE I

d 3 30 11 44 45 30 8E ASCNNEL EX80SunES

' 5 C"' # 7' 0" j'

( O gl" 80 PEaSCNNE L iN iES

\\

I Fl i ;i I j@l 1

334 ER SESCRIPT60N 3 9 11 i;

80 L OSS 18 0 2 C A'.' A CE T'] F AC: LI Tv T *

  • I.

OESCai8 'i ' N l 1 1

3 7

4

's

'O 800212070 7 N R C US E ON L Y M

9tSCa m i 18I i

liiiiiiiiiiiii 7

0 63 69

30. h W.

R.

Cartwricht Rwess

(~103 L 8u4-5151 N AYE OF *RE*ARER

Virginia Electric and Power Company Morth Anna Power Station, Unit #1

Attachment:

Page 1 of I Doc ke t No. 50-313 Re po r t No. LER 30-12/03L-0 Descrittien of Event On January 11, 19 30, during periodic testing, nain steam trip valve TV-MS101A failed to close within the required isolation tice of 5 seconds from the Train B control room pushbutton.

Closure tice was measured at

5. 2 seconds.

Probable Consequences of Occurrence The consequences cF-this event evere.-limited because the closure -ice for TV-MS101A was acceptable using the pushbutton for Train A.

Also, because the Action statement of T.S.

3. 7.1.5 was strictly adhered to, the health and safety of the general public were not af fected.

There are no generic implications associated with this occurrence.

Cause of Event

It is not known why it took TV-MS101A more than 5 seconds to fully close using the Train 3 pushbutton.

Since a stop watch is presently used to neasure the valve closure time, human error in the use of the stop watch could have af fected the final test results.

Inmediate Corrective Action An airline check valve was disassembled and inspected for debris which night have accumulated and caused the valve disc to bind.

During the inspection no problem was found and the valve was reassembled.

TV-MS101A was then retested using the Train B pushbutton and the closure time was within acceptable limits (4.8 seconds).

Scheduled Corrective Action No further actions are required.

Actions Taken to Prevent Recurrence No further actions are required.