ML19260D919
| ML19260D919 | |
| Person / Time | |
|---|---|
| Site: | Dow Chemical Company |
| Issue date: | 12/14/1979 |
| From: | Langner R, Mack J DOW CHEMICAL CO. |
| To: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19260D917 | List: |
| References | |
| NUDOCS 8002120604 | |
| Download: ML19260D919 (1) | |
Text
-
DOW CHEMICAL U.S.A.
=
December 14, 1979 uicHIGAN DMSloN MIDLAND. MICHIGAN 48640 United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attn:
R. F. Beishman, Chief Reactor Operations and Nuclear Support Branch DOW CHEMICAL U.S.A. - TRIGA PEACTOR DOCKET NO. 50-264 The inspection conducted by C. H. Brown on October 22-24, 1979 revealed that the procedural monthly checklist was not performed for the month of June,1979 as required as part of section I.7 of the Technical Speci-fications.
In response to this finding, a " reminder board" has been established to visibly remind the reactor staff and supervision of the times when periodic checklists are due.
Since all monthly checklists subsequent to June,1979 have been properly completed, we feel we are in full compliance at the present time, and we feel the reminder board will prevent similar non-compliance in the future.
. h'f I
J. M. Macki R.
. Langner, Chairman Research Manager Radiation Saf ety Committee Analytical Laboratories 1603 Building 1602 Building (517)636-4344 (517)636-5183 ki 1950 294 f*
~
p AN OPERATING UNIT OF THE DOW CHEMtCAL COMPANY 80077~ (C4
_