ML19260D397
| ML19260D397 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/04/1980 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| TLL-040, TLL-40, NUDOCS 8002080689 | |
| Download: ML19260D397 (1) | |
Text
Metropolitan Edison company Post Office Box 480 g
Mufdletown, Pennsylvan a 17057 717 944-4041 Writer's Direct O'ai Number February 4, 1980 TLL 040 Director of Nuclear Reactor Regulation Attn:
R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Fire Protection Per our letter of October 16,1979, GQL 1265, Met-Ed committed to have the Halon System for the modular computer room sub-floor and adjacent cable trench operational by February 20, 1980. The Halon System will be inntalled by the coc:mitted date.
However, the system cannot become operational until several dampers are installed. Therefore, the revised operational date for the Halon System for the modular computer room sub-floor and adjacent cable trench is June 1, 1980.
Sincerely, A 8L J. G. Herbein Vice President L
Nuclear Operations A.H :DGM: hah 1942 052
$T e
Mere::c.un Ecsan Camory 3 a Uemce u tre C~T P n c W es S,sem
()
8002080