Interim Deficiency Rept 4 Re Inadequate Crimping on Certain Power Generation Control Complex Interconnecting Cable Pin Connections Supplied by Ge.Final Rept of GE Investigation Will Be Submitted in Sept 1980
ML19260D032
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/31/1980
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
References
AECM-80-18, NUDOCS 8002070275
Download: ML19260D032 (2)


Text

a . Vb

8. ,1 jiIh y All" ' 31PPI POWER & LIGHT . COMPANY Helping B uild Afis sissuppi' L P . C' E7X 64 0, J AC K S O N, MI S SIS SIP PI 39205 Jinuary 31, 1980 e si o o u r t w ocean m es Office of Inspection & Enforcement

. U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 3100 Atlanta, Georgia 30303 ATTENTION: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station File 0260/0266/15521/15525 Potentially Reportable Deficiency No. 79/04 Interin Report No. 4 AECM-80/18 On February 23, 1979, Mississippi Power & Light Company notified Mr. W. B. Kenna of your of fice of a potentially reportable deficiency at the Grand Gulf Nuclear Station construction site. The deficiency concerns inadequate crimping on certain Power Generation Control Complex interconnecting cable pin connections supplied by the General Electric Company.

General Electric initiated the following Field Disposition Instructions (FDI) to investigate the deficiency:

1. FDI-WAGM was issued to inspect the termination modules for damaged wire insulation. This FDI has been completed and the results are currently being evaluated.
2. FDI-WAGN was issued to perform an inspection of all CC supplied PGCC cables and to repair / rework cables as required. This inspection is in progress.
3. The s.: ope of the investigation has been expanded to include a pin pull teet of crimp strength in the Panel inserGT "od connectors. This was accomplished by issuance of FDI-h'AHX in December, 1979. This inspection is in progress.

. M38 038 30/7 e

So 8002 07 0 d lp O

Member Middle South Utilities System j

,, - . ~ . . ,. .

.-.n_

MISSISSIPPI POWER & LIGHT COMPANY Office of Inspection & Enforcement AtCM-80/13 U. S. Nuclear Regulatory Commission Ps:;c 2

. An evaluat' ion of the inspection results will be performed by General Electric when the inspections are completed. Mississippi Pouer & Light expects that a determination of reportability from the evaluation will be available in a final report to you in September 1980.

. Yours truly,

_fY0 rfb?"

L F. Dale Nuclear Project : tanager JRF/JDR:bsh cc: Mr. N. L. Stampley bec: br. D. C. Gibbs Mr, R. B. McGehee Mr. Adrian Zaccaria Mr. T. B. Conner Mr. J. N. Ward CO?'i M Mr. D. M. Lake Mr. Victor Stello, Jr., Director 4e Mr. R. L. Scott Division of Inspection & Enforcement Mr. W. L. Nail U. S. Nuclear Regulatory Commission Mr. J. P. McGaughy Washington, D. C. 20555 Mr. T. E. Reaves Mr. C. K. McCoy Mr. J. W. Yelverton Mr. A. R. Smith File h