ML19260D024

From kanterella
Jump to navigation Jump to search
Forwards Alternate Safe Shutdown Capability in Event of Fire in Cable Spreading Room Per NRC 791022 Request. Engineering Design Phase Completed & Implementation of Mods Initiated.Rept Available in Central Files Only
ML19260D024
Person / Time
Site: Pilgrim
Issue date: 01/31/1980
From: Andognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19260D025 List:
References
80-19, NUDOCS 8002070268
Download: ML19260D024 (1)


Text

.,,,

ScsTON EDISON COMPANY GtNenA6 Omets GCC BovtsTcM STattT ScaroN. MAestAcNuorTTs 02199 G. CAmL ANoosNINI EuPERINTEMOENT NUCLEAR opCRArtONE CEPaRTMENT January 31, 1980 BECo. Ler. #80-19 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 Alternate Shutdown Cacability References (a) NRC letter (T. A.

Ippolito) to BECo.

(G. C. Andognini) titled " Staff Position on Safe Shutdown Capability" dated October 22, 1979.

~

(b) BECo. Letter (G. C. Andognini) to NRC (T. A. Ippolito) titled "Information on Alternate Shutdown Capaaility" dated October 5, 1979.

Enclosures (A) Four (4) copius of report entitled

" Alternate Safe Shutdown capability in the Event of a Fire in the Cable Spreading Room"

Dear Sir:

Enclosure (A) constitutes the additional information you requested in Reference (a) to com"lete your review of our alternate shutdown capability. The enclosure sup-piements information we previously submitted with Reference (b).

Also, please be advised that the engineering design phase of the alternate shutdown system has been completed and the implementation of modifications was initiated approximately one month ago.

If during your review of the enclosed material you should have any questions og f

concerns, please do not hesitate to contact us.

V

+ 4p-Very truly yours, g$

s

'^

m 8 030 s-g e