,i

[

[#paarc5,

UNITED STATES 7e NUCLEAR REGULATORY COMMISSION V'

REGION IV E

3 o

G11 RYAN PL AZ A DRIVE",SulTE 1000 v,.

i. E ARLINGTON, TEXAS /G012 NI D79 Docket No.

99900344/79-01 ABEX Corporation REMCO Hydraulics Division ATTN:

Mr. M. L. Russell Quality Assurance Manager 934 South Main Street Willits, California 95490 Cent 1cmen:

This refers to the QA Program inspection conducted by Mr. V. H. Hunter of this office on September 17-20, 1979, of your facility at Willits, California associ-ated with the manufacture of Hydraulic Snubbers and to the discussions of our findings with Mr. E. E. Berry and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented.

The inspection effort is not designed to assure that udique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the h1C requires cach of its licensecs to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the h2C's inspection exempts you from inspections by an h1C licensee or his agents nor from taking effective cor-rective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report. Uithin these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain h1C requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us w' thin thirty (30) days of your receipt of this report a written statement cantaining, (1) a description of steps that have been or will be taken to correct these items, (2) a descriptt in of steps that have been or will be taken to p7: event recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

1936 282 800207012 5

ABEX Corporation 2

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Titic 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspeciton report will be placed in the Cor::nission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statcaent of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, U!S

~)M2#

Uldis Potapovs, Chie'f Vendor Inspection Branch

Enclosures:

1.

Notice of Deviatica 2.

Inspection Report No. 99900344/79-01 e

.)

,.d l

. 4 6

9 1936 283

...