ML19260C802
| ML19260C802 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 01/30/1980 |
| From: | Randy Hall BROOKHAVEN NATIONAL LABORATORY |
| To: | Ferguson R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002060156 | |
| Download: ML19260C802 (2) | |
Text
.
's BROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVERSITIES, INC.
Upten. New Vcrk 11073 Cecortrrent cf Nuc:ect Energy (516) 245 2144 January 30, 1980 Mr. Robert L. Ferguson Plant Systems Branch U.S. Nuclear Regulatory Comission Washington, D.C.
20555
Dear Bob:
Attached is the Brookhaven National Laboratory approval of Item 3.1.11, fire protection review, for Haddam Neck nuclear power plant.
Respectfully yours,
~
8n)/
,s $,,
w-Robert E. Hall, Group Leader Reactor Engineering Analysis PEH:EAM:sd attachment cc.:
R. Cerbone wo/att.
L. Derderian W. Kato wo/att.
E. MacDougall V. Panciera wo/att.
1934 082
$ cot S///
sooeoc e fog g
HADDAM NECK Fire Protection Review Item 3.1.11 Ventilation Equipment The SER states that portable ventilation equioment will be provided o
at strategic locations throughout the plant for fire brigade use. The licensee has purchased three 16" Model P-164, 5200 CFM, 115 volt Super Vac Smoke Ejectors.
We recomend that the Nuclear Regulatory Comission find this item acceptable.
4 1934 083