Discusses Third Auxiliary Feedwater Train Re NRC 791107 Requirements.Plans to Utilize Piping & Piping Support Codes Used in Original Plant Const.Design Criterion Will Facilitate Design,Const & Inservice Insp of New Sys
ML19260C733
Person / Time
Site: Calvert Cliffs  
Issue date: 01/03/1980
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8001080529
Download: ML19260C733 (1)


Text

BALTIMORE GAS AN D ELECTRIC COMPANY GAS AND ELECTRIC OUILDING B ALTIMOR E, M ARYLAN D 21203 January 3, 1980 AmtHun E.LuNovALL,JR.

vice Passietser Sup*Lv Office of Nuclaar Reactor Regulation U. S. Nuclear negulatory Commission Washington, D. C.

20555 Attn:

Mr. Robert W. Reid, Chief Operating Rehetors Branch #h Division of Operating Ree.ctors

Subject:

Calvert Cliffs Nuclear Power Plant Units Nos. 1 & 2, Dockets Nos. 50-317 & 50-318 NRC Requirements for Aux Feed Systems

Reference:

(a) NRC letter, dated 11/7/79 from Eisenhut to Lundvall, same subject.

BG&E letter, dated 12/13/79 from Lundvall to Eisenhut, same subject.

Gentlemen:

Reference (b) informed your Office of our commitment to design and install a third auxiliary feedvater train to satisfy the requirements of Reference (c). For your information, it is our intention to utilize the same codes for the piping and piping supports as were used for the original plant construction, that is, ANSI B 31.1, 1967 and ANSI 31.7, 1969, with 1970 addenda. We feel this design criterion is necessary to facilitate the design, construction and inservice inspection of the new system train.

If you have any questions or comments, please contact us.

Very truly yours, yn cc:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire Mr. E. L. Conner, Jr. - NRC Mr. J. W. Brothers - Bechtel 1704 312 8001080 52_p