ML19260C545

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept of Const Deficiency 15,re Procedural & Performance Deficiencies Identified by Industrial Engineering Works During Ultrasonic Testing of Structural Welds
ML19260C545
Person / Time
Site: Waterford 
Issue date: 01/02/1980
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19260C547 List:
References
LPL-12785, NUDOCS 8001070399
Download: ML19260C545 (1)


Text

"

l OUISIANA P O W E R & L 1 G H T! '.n cuAnaNos Swa o ecx 6oC8

  • NEW CALEANS. LCutS!ANA 70174 6504) 366-2345

$u?NErsys January 2,1980 0 L ASWELL ves went power %xkstan LPL 12785 Q-3-A35.02.01 Q-3-A35.07.15 Mr. K. V. 9eyfrit, Director, Region IV U. S. Nuclear Regulatory Co= mission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Ter.as 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Interim Report of Corstruction Deficiency No. 15

" Procedural and Performance Deficiencies in Ultrasonic Testing of Structural Welds Performed By Industrial Engineering Works"

Reference:

LP&L Telecon with NRC dated December 4, 1979 reporting Potential Construction Deficiency

Dear Mr. Seyfrit:

In accordance with the requiremen:s of 10CFR50.55e, we are hereby providing two copies of Interim Construction Deficiency Report No. 15 " Procedural and Performance Deficiencies in Ultrasonic Testing of Structural Welds by Industrial Engineering Works, Trenton, N J".

The final report will be forwarded by June 30, 1980.

Very truly yours, D. L. Aswell DLA/TFG/grf Enclosures cc:

1) Director Office of Inspection and Enforcement

]

g{ )"][

U. S. Nuclear Regulatory Coc: mission Washington, D.C.

20555 (with 15 copies of report)

O/7 2)

Director Office of Management gy Information and Program Control j

U. S. Nuclear Regulatory Commission

// /

Washington, D.C. 20555 (with one copy of report) 3 800107g %]