Summarizes Conclusions & Work Assignments Made at 790730 Meeting Re Task Action Programs A-3,A-4 & A-5.Concludes Analysis of LOCA W/Concurrent Steam Generator Tube Failure & Effect on ECCS & Core Performance Not Necessary
ML19260C451
Person / Time
Issue date: 08/09/1979
From: Almeter F, Strosnider J
Office of Nuclear Reactor Regulation
To: Hanauer S
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-03, REF-GTECI-A-04, REF-GTECI-A-05, REF-GTECI-SG, TASK-A-03, TASK-A-04, TASK-A-05, TASK-A-3, TASK-A-4, TASK-A-5, TASK-OR NUDOCS 8001030451
Download: ML19260C451 (5)


Text

.

ga arog f

UNITED STATES o

y

)y,((g g

NUCLEAR REGULATORY COMMISSION

%.s.[,f.

E WASHINGTON, D. C. 20555 r,

/

AUG 0 91979 MEMORANDUM FOR:

S. H. Hanauer, Director for '

Unresolved Safety Issues FROM:

J. Strosnider, Task Manager, TAP A-3 and A-5 F. Almeter, Task Manager, TAP A-4

SUBJECT:

JULY 30, 1979 MEETING (USI; TAP-A-3, 4 AND 5)

This memorandum provides a summary of the conclusions that were reached and the work assignments that were made at the July 30, 1979 meeting. Attachment I provides a list of meeting attendees.

A major topic at the meeting was the determination of whether or not an analysis of a LOCA with concurrent steam cenerator tube failures and its effect on ECCS and core performance is necessary.

It was concluded that the LOCA analysis is not necessary since tube plugging criteria will be governed by the burst strength of the tubes (MSLB conditions) and the system analyses indicate many more tube failures are tolerable during a LOCA than during a MSLB. Therefore, the tolerable number of tube failures necessary for establishing a statistically based ISI pre gam will be determined by the MSLB/ tube failure analysis.

The following work assignments were made at the meeting:

1.

J. Strosnider, F. Almeter, and K. Parczewski will prepare the justification for the position that the LOCA analysis need not be performed.

2.

F. Odar (AB), M. Wohl (EEB), and F. Akstulewicz (AAB) are responsible for evaluating the MSLB with concurrent steam generator tube failures scenario and establishing criteria which will ensure that core integrity and radiological limits are not violated. They have scheduled a meeting for August 3 at at 1:00 pm in Room P-602 to begin work on this subject.

3.

J. Zowlinski will take a further look at containment response to MSLB to make sure his calculation bound all types of containments.

He will also take a look at the LOCA condition and will provide an outline for a section in the NUREG report entitled " Containment Response to MSLB and LOCA."

1b i

8001030 1701 031

S. Hanauer Attachment II is the draft outline for the final NUREG report stipulating each reviewers contribution and due date.

The next meeting on this subject has been scheduled for August 13 at 1:00 pm in Steve Hanauer's office.

- [

.a.

..J. Strosnider, Task Manager, A-3 and A-5 Engineering Branch Division of Operating Reactors

.2 y

d, --//NudO9 F. Almeter, Task Manager, A-4 Engineering Branch Division of Operating Reactors

Attachment:

As stated cc:

C. Hanauer M. Aycock D. Eisenhut V. Noonan B. D. Liaw F. Almeter J. Strosnider K. Parczewski F. Odar J. Zowlinski F. Akstulewicz M. Wohl E. Murphy 1701 032 b

\\

8 001 0331

?

_.f

ATTACHMENT I S. Hanuaer (part-time)

M. Aycock (part-time)

J. Strosnider F. Almeter K. Parczewski F. Odar F. Akstulewicz J. Zowlinski M. Wohl E. Murphy 1701 033

00TLIf1E FOR TASK ACTI0ft PLA!15 A-3, A-4 A!;D A-5 f

f4UREG REPORT Responsible Tentative Section Reviewers Due Date I.

Introduction J. Strosnider 11/1/79 F. Almeter II. Operating Experience J. Strosnider 11/1/79 F. Almeter III. Tube Integrity Criteria A.

Mechanical Integrity J. Strosnider R. Rajan 11/1/79 B.

Materia 1' Integrity B. Turoviin F. Almeter 12/1/79 C.

Plugging Criteria J. Strosnider B. Turovlin J. Rajan 12/15/79 F. Almeter IV. Accident and Consequences Analyses V

A.

Containment Response to MSLB & LOCA J. Zowlinski 10/1/79 C.$

B.

ECCS and Core Response During LOCA J. Strosnider 10/1/79 s'

K. Parczewski x"

C.

MSLB Outside Containment F. Akstucewicz 10/1/79 F. Odar M. Wohl V.

Inservice Inspection A.

?!DE Techniques L. Frank il/1/79 B.

ECT statistical Analysis J. Strosnider 12/1/79 L. Frank

],, ;.. L

' Le k C.

ISI Programs J. Strosnider 12/1/79 L. Frank 1701 034

. t Responsible Tentative Section Reviewer Due Date r

VI. Conclusions and Recommendations A.

ISI Requirements ALL AB0VE 12/31/79 B.

Tube Plugging Criteria C.

Cost Benefit Analysis Environmental 12/31/79 Evaluation Branch 1701 035