ML19260C339

From kanterella
Jump to navigation Jump to search
Forwards LER 79-126/03L-0
Date released: 10/01/2019 Download: ML19260C339


LER 79-126/03L-0:on 791121,during Plant Svc Water Pump Operability Test,Svc Water Pump Failed to Meet ASME Section II Requirements.Caused by Distortion of Impeller by Metal Foreign Object.Pump Rebuilt
ML19260C341
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/14/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260C341 (3)
Forwards LER 79-126/03L-0
ML19260C338
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/14/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260C338 (1)