Revised QA Manual for Handling,Storage & Shipping of Radioactive Matl Shipping Packages
ML19260C165
Person / Time
Site: 07100352
Issue date: 11/20/1979
From: Jeffery Wood
NILES STEEL TANK
To:
Shared Package
ML19260C164 List:
References
14811, NUDOCS 7912180657
Download: ML19260C165 (10)


Text

.

M OUALITY ASSURANCE MANUAL October 3, 1979 Revised-November 20, 1979 1613 546 79121806 5 7

,] L M

NILES STEEL TANK COMPANY

'l 7r[rrwodfe7e$^ess.UN

' \\ Z T-3

! ' '. 's j

U

'a tr b

NILES STEEL TANK COMPANY

.,=,.

QUALITY ASSURANCE PROGRAM 10CFR Part 71 THIS QUAllTY ASSURANCE MANUAL. SHALL BE USED FOR THE HANDLING, STORAGE AND SHIPPING OF RADI0 ACTIVE MATERI AL SHIPPING PACKAGES.

$lhY J. C. Wood Radiation Safety Officer NILES STEEL TANK COMPANY 1613 547

ORGANI ZATIONAL STRUCTURE RADIOGRAPHI C DEPARTMENT RADIOLOGICAL SAFETY OFFICER J. C. WOOD

}

Other Responsibilities P res i dent RA D IOGRA PHER J. L. GREGG Other Responsibilities Q. C. Manager I

I I

Assistant RadiogRra p her Radiographer Tra i nee L. E. KRUEG-T.

R. BA TTON l

(

g Other Responsibili ties Other Responsibilities !

Draftsman Q. C.

Inspector l

1613 548

QUALITY ASSURANCE MANUAL Page 1

of 7

1.0 ORGAN I ZATION 1.1 The final responsibility for the Quality Assurance Program for Part 71 requirements rests with the Niles Steel Tank Company.

Design and fabrication of the Radioactive Material Shipping Package shall not be conducted under this Quality Assurance Pro-gram.

1.2 The Radiation Safety Officer is responsible for overall administration of the program, training and certification document control and auditing.

1.3 The Radiographers are responsible for handling, storing, shipping, inspection, test, operating status and cecordkeeping.

1613

$49 6

g

QUALITY ASSURANCE MANUAL Page 2

of 7

2.0 OU ALITY ASSURANCE PROGRAM 2.1 Training for all Q. A. Functions, prior to engage-ment in these functions, i s requi red according to written procedures.

Q. A. Program revisions will be made according to written procedures with management approval.

The Q.A. Program will ensure that all defined Q.C. Procedures, Engineering Pro-cedures and specific provisions of the package design approval are satisfied.

The Q.A. Program emphasizes control of the characteristics of the Radioactive Material Shipping Package, which are critical to safety.

The Management of Niles Steel Tank Company has established and i s implementing this Q. A. Program.

2.2 The Radiation Safety Officer shall assure that all radioactive material shipping packages are designed and manufactured under a Quality Assurance Program, approved by the Nuclear Regulatory Commission for all packages designed or fabricated after 1 January 1979.

REFERENCES:

NSTCO Radiography Operations Section 2.0 Training Program Section 3.0 Radiographic Operating Procedures Section 8.0 Source Changer Procedure, inspection and Maintenance Form Cover letter of this Q.A. Manual 1613 350 r

QUALITY ASSURANCE MANUAL Page 3

of 7

3.0 00CUMENT CONTROL 3.1 All documents related to Radioactive Material Shipping Package will be controlled through the use of performed according to written procedures approved by management.

3.2 The Radiation Safety Officer shall insure that all Q. A. Functions are conducted in accordance with the latest applicable changes to these documents.

REFERENCES:

NSTCO Radiography Operations Section 8.0 Source Changer Procedure, inspection and Maintenance Form 1613 351

s 6

QUALITY ASSURANCE MANUAL Page 4

of 7

4.0 H AN DL IN G, STORAGE AND SHIPPING 4.1 Written procedures concerning the handling, storage and shipping of the P.adioactive Shipping Package will be followed.

Shipments will not be made unless all tests, certifications, acceptances, and final inspections have been completed.

Work instructions will be provided for handling, storage and shipping operations.

4.2 Radiography personnel shall perform the critical handling, storage and shipping operations.

REFERENCES:

NSTCO Radiography Operations Section 8.0 Source Change r Procedure, inspection and Maintenance Form 1613 552

QUALITY ASSURANCE MANUAL Page 5

of 7

5.0 INSPECTION, TEST AND OPERATING STATUS 5.1 Inspection, Test and Operating Status of the Radio-active Material Shipping Package will be indicated and controlled by written procedures.

Status will be indicated by log entry.

Status of nonconforming parts or package will be positively maintained by written procedures.

5.2 Radiography personnel shall perform the regulatory required inspections and tests in accordance with writ-ten procedures.

The Radiation Safety Officer shall ensure that these functions are performed.

REFERENCES:

NSTCO Radiography Operations Section 4.0 internal Inspection & Management Control System Section 5.0 Emergency Procedure Section 8.0 Source Changer Procedure, inspection and Maintenance Form 1613 353

QUALITY ASSURANCE MANUAL Page 6

of 7

6.0 QUALITY ASSURANCE RECORDS 6.1 Records of package approval s, procurement, in spec-tions, tests, operating logs, audit re sul ts, pe r-sonnel training ar d qualifications, and records of shipments will be maintained.

Descriptions of equipment and written procedures will also be main-tained.

6.2 These records will be maintained in accordance with written procedures.

The records will be in den t i fi-able and retrievable.

A list of these records, with their storage locations, will be maintained by the Radiation Safety Officer.

REFERENCES:

NSTCO RADIOGRAPHY OPERATIONS Section 2.0 Train ing Program Section 3.0 Radiographic Operating Procedure Section 4.0 Internal inspection and Management Control System Section 7.0 Inspection and Maintenance Procedures Section 8.0 Source Change r Procedure, inspection and Maintenance Form 1613 354

QUALITY ASSURANCE MANUAL Page 7

of 7

7.0 AUDITS 7.1 Established schedules of audits of Quality Assurance Program will be performed using written checklists.

Results of audits will be maintained and reported to management.

Audit reports will be evaluated and deficient areas corrected.

The audits will be dependent en the safety significance of the activity being audited, but each activity will be maintained as part of the quality assurance records.

Members of the audit tecm shall have no responsibility in the activity being audited.

REFERENCES:

NSTCO Radiography Operations Section 4.0 Internai Inspection and fianagement Control System 1613 355 14311

..