Notifies of Primary Containment Integrated Leak Rate Test Scheduled for Facility
ML19260C109
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/10/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JAFP-79-690, NUDOCS 7912180573
Download: ML19260C109 (1)


Text

POWER AUTHORITY OF THE STATE OF NEW YORK J AMEs A. FIT 2 patrick NUCLE AR POWER PLANT Nb JOHN D. LEONARD, JR.

P.O. BOX 41 Resident Manager Lycor ung, New York 13093 December 10, 1979 3is.32384o JAFP 79-690 Director of Nuclear Reactor Regulations United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Thomas A. Ippolitto, Chief Operating Reactors Branch No. 3 Division of Operating Reactors

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 PRIMARY CONTAIhMENT INTEGRATED LEAK RATE TEST SCHEDULE

Reference:

Letter from John D. Leonard, Jr. to Director of Nuclear Reactor Regulations, Attention: Daniel J.

Donoghue, Dated March 6,1979 (Serial No. JAFP 79-111)

Dear Sir:

The FitzPatrick Plant provided to your office in the reference above, a report of the results of the primary containment integrated leak rate test which was conducted during the 1978 refueling outage prior to the startup for operation in fuel cycle 3.

In accordance with the requirements of 10 CFR 50, Appendix J, Paragraph III.D., the FitzPatrick Plant wishes to inform your office of our plans with respect to the Type A ritest schedule. 'Our current plans dictate that the next scheduled test will be performed prior to the start-up for fuel cycle 5 following refueling wMch is currently scheduled for 1981. This test will be the second of a set of 3 Type A tests which must be performed during each 10 year service period and will be approximately 7 years from the initital test conducted and approximately 3 years prior to the end of the first 10 year service period.

Very truly yours, JDL:VC:brp

- JdHkD. LEONARD,JR.