ML19260B881

From kanterella
Jump to navigation Jump to search
Notifies That Licensee Response to IE Bulletin 79-19, Packaging of Low Level Radwaste for Transport & Burial, Has Not Been Received.Immediate Response to Bulletin Items Required
ML19260B881
Person / Time
Issue date: 11/26/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
HATTORI CORP. OF AMERICA (FORMERLY SEIKO TIME CORP.)
References
NUDOCS 7912130612
Download: ML19260B881 (1)


Text

e asc,

o

  1. j

'o, UNITED STATES NUCLEAR REGULATORY COMMISSION

$ j. ', 7

,5 3EGION V f

1990 N. CALIFORNI A HOULEVA90 g, P ' +'

[

SUITE 202. WALNUT CRE EK PLAs A

  • e,,e WALNUT CREEK,CAllFORNIA 94%1 N0'l 0 0 1379 SEI<0 TI"E C09POR A TIrtN 640 FIFTH AVENUE

'4 E 4 Y O R,(

gy

}ggg9 Gentlemen:

On August 10, 1979, we sent IE Bulletin 79-19, " Packaging of low-level Radio-active Waste for Transport and Burial", to you for information and action.

Item 9 of that Bulletin required you to report, in writing, within 45 days of receipt of the Bulletin, your plan of action and schedule with regard to Items 1 through 8 of the Bulletin.

Thus far, we do not have a record of your response to the Bulletin.

You are reminded that such response is required. Authority and clearance for issuing the reporting requirements of the bulletin has been approved for this agency by the U. S. General Accounting Office.

Another copy of Bulletin 79-19 is enclosed for your use. We request your prompt attention to this matter, Sincerely,

$Dvn~dlA R. H. Engelken, Regional Director

Enclosure:

IE Bulletin flo. 79-19 II Qs.

7190 m i c/

7 912140 6/ E