ML19260B233

From kanterella
Jump to navigation Jump to search
Forwards LER 79-120/03L-0
Date released: 10/01/2019 Download: ML19260B233


LER 79-120/03L-0:on 791113,emergency Diesel Generator Tripped While Performing Manual Start.Caused by High Engine Crankcase Pressure Due to Ejector Failure.Engine Ejector Cleaned & Reinstalled
ML19260B237
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/29/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260B237 (2)
Forwards LER 79-120/03L-0
ML19260B232
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/29/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260B232 (1)