ML19260B220

From kanterella
Jump to navigation Jump to search
Forwards LER 79-020/01T-0
Date released: 10/01/2019 Download: ML19260B220


LER 79-020/01T-0:on 791115,during Refueling Shutdown,Anchor in Steam Generator a Auxiliary Feedwater Line Contained Const Deficiency.Caused by Improper Installation of Three Bolts in Anchor Support Plate.Anchor Permanently Modified
ML19260B223
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/27/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19260B223 (2)
Forwards LER 79-020/01T-0
ML19260B219
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/27/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19260B219 (1)