ML19260B209

From kanterella
Jump to navigation Jump to search
Forwards LER 79-019/01T-0
Date released: 10/01/2019 Download: ML19260B209


LER 79-019/01T-0:on 791107,while Filling Steam Generator a Secondary Side W/Water to Perform secondary-to-primary Leak Test,Dilution of RCS Occured.Caused by Leakage from Open Steam Generator Tube Falling Into Primary Outlet Nozzle
ML19260B210
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/21/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19260B210 (3)
Forwards LER 79-019/01T-0
ML19260B208
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/21/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19260B208 (1)