Consumers Power (Q@ Q Stephen H. Howell Senior Vice President General Offices: 212 West Michigan Avenue. Jackson, Michigan 49201

  • Area Code 517788-0550 80E0113 Howe 298-79 RFG 1179-05 -

November 30, 1979 Director of Nuclear Reactor Regulation Att Domenic B Vassallo, Acting Director Division of Project Management US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT DOCKETS 50-329, 50-330 AMENDMENT 71 FILE: 0485.11 UFI=1141-71*01*03 SERIAL 7960 Enclosed herewith is Amendment 71 to Consumers Power Company's application for construction permits and operating licenses containing forty-one (41) copies including three (3) signed originals of Revision 10 to the Ccmpany's Environmental Report, Operating License Stage.

Revision 10 to the Environmental Report (OLS) contains updated material as detailed in the application page.

We are retaining an additional one hundred nine (109) copies of Revision 10 to the Environmental Repo..t for direct distribution. Within ten (10) days after docketing, we will previde an affidavit that distribution in accordance with your March 18, 1979 letter has been completed.

s' y Y

b 3 I (} -L.pC.-(y h

18T MSB 136 b m 20ao i

CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET 50-329 DOCKET 50-330 AMENDMENT 71 Enclosed herewith, revising and supplementing the above-entitled application, are revised pages for incorporation in the Environmental Report (0LS). The Environmental Report was submitted with Amendment 43 to the above dockets on April 12, 1978. The enclosed material consists of the following:

1. Revised response to Mr W H Regan, Jr's letter of May 22, 1978 requesting additional information.
2. Revised response to Mr W H Regan, Jr's letter of October 11, 1978 requesting additional information.
3. Revised material on system demand and reliability, water-flow rates and water use, transmission line construction schedule, aquatic and terres-trial preoperational measurement programs, available data on entrainment ,

and impingement sampling, preoperational radiological monitoring schedule, environmental technical specifications for terrestrial and meteorological surveys, and licenses, permits and approvals.

4. Co:rection of minor errors and omissions.
5. Changes relating to the above (Tables of Contents, Text, Figures, Tables, etc).

These new and revised pages bear the notation " Revision 10 - November 1979" and are marked in the margin to indicate where changes have been made.

Additional pages and figures have been added as reflected on the revised Midland Plant ER " List of Effective Pages."

CONSUMERS POWER COMPANY By Yd hd6 StephedsH Howell, Senior Vice President Dated: November 30, 1979 Sworn and subscribed to before me this 30th day of November 1979.

1kt6 W. ALw Betty @ Bishop, NotaryVPublic Jackson County, Michigan My commission expires September 21, 1982 rp1179-0422a-13 j4}g/ .}}