ML19260A740

From kanterella
Jump to navigation Jump to search
Forwards LER 79-049/03L-0
Date released: 10/01/2019 Download: ML19260A740


LER 79-049/03L-0:on 791027,letdown Orifice Isolation Valve 1-CVC-HV-8149A Had Not Been Tested Prior to Plant Entering Mode 4.Caused by Personnel Error.Personnel Reinstructed in Proper Documentation Procedures
ML19260A744
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/27/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260A744 (3)
Forwards LER 79-049/03L-0
ML19260A739
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/27/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260A739 (1)