ML19260A624

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 791002-05
ML19260A624
Person / Time
Site: Black Fox
Issue date: 10/15/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19260A616 List:
References
50-556-79-04, 50-556-79-4, 50-557-79-04, 50-557-79-4, NUDOCS 7912030020
Download: ML19260A624 (1)


Text

50-556/79-04 56-557/79-04 Appendix A NOTICE OF DEVIATION

~

Based on the results of the NRC inspection conducted on October 2-5, 1979, it appears that certain of your activities related to Black Fox station, Units 1 and 2 deviate from commitments made in your Preliminary Safety Analysis Report (PSAR) as indicated below:

Section 17D.1.5 of the PSAR states thaE all Field Project Management activities that affect quality of safety-related items will be per-formed in accordance with documented procedures.

Procedure FPPM 4.8, " Storage and Preservation of Material and Equipment,"

Revision 1, requires that Equipment Storage Maintenance Cards (Form B-3038) shall be'kept in plastic envelopes attached to items requiring preservation and maintenance.

Contrary to the above:

An unapproved form, " Preventative Maintenance Record," was substituted in place of Form B-3038 for a 16 inch gate valve (MPL E 22F001) stored in Warehouse C.

This is a deviation.

1461 22i 1912 n a o 05LO

6 w

U. S. NUCLEAR REGULATORY C0FDiISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 50-556/79-04; 50-557/79-04 Do'cket No. 50-556; 50-557 Category Al Licensee: Public Service Company of Oklahoma r

Box 201

~

Tulsa, Oklahoma Facility Name: Black Fox Station, Units 1 & 2 Inspection at:

Black Fox Station and Tulsa Inspection conducted: October 2-5, 1979

/OMM Inspector:d/,

jm W. G. Hubacek, Re' actor Inspector, Projects Section Date N

/d 2[79 Approved:

e.------

~

W. A. Crossaan, Chief, Projects Section.

Date Inspection Su ry:

Insnection on October 2-5, 1979 (Report No. 50-556/79-04; 50-557/79-04)

Areas Inspected: Routine, unannounced inspection to observe construction activities; review construction status; review vendor surveillance and site QA audit activities; and review status of the development of PSO's ASME Section III certification program. The inspection involved tuenty-eight inspector-hours by one NRC inspector.

Results: Of the four areas inspected, one deviation was identified in one area (deviation - use of unapproved form for documenting preventive main-tenance - paragraph 2).

1461 222 DUPLICATE DOCUMENT Entire document previously entered system under:

ANO Ef N o.

of pcges:

,