ML19260A589

From kanterella
Jump to navigation Jump to search
Informs That Unit 2 Now in Compliance W/Certificate of Compliance 6058 Re B-3 Cask,Due to Replacement of Thermal Shield.Unit 3 Still Out of Svc
ML19260A589
Person / Time
Site: 07106058
Issue date: 10/30/1979
From: Baer T
U.S. ECOLOGY, INC. (FORMERLY NUCLEAR ENGINEERING
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
14565, NUDOCS 7911280341
Download: ML19260A589 (1)


Text

ppg 7/- 6os v Nuclear Engineering Con 1pany Inc.

J 3 9200 SHELBYVILLE ROr.D. SUtTE 526 P. o. Box 7246 LOUI SVI LL E. K E NTUC K Y 40207

="O N E f 5o2) 426-7860 October 30, 1979 Mr. Charles E. MacDonald, Chief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS U.

S. Nuclear Regulatory Commission l

Washington, D.C.

20555 Docket 71-6058 Report of Nonconformance with Design Specification

Dear Mr. MacDonald:

This letter supplements our previous report to you in our letter of May 7, 1979, advising that B-3 casks, Units 2 and 3, were not in compliance with the provisions of Certificate of compliance No. 6058.

A detailed inspection revealed that the thermal shield on the lid of B-3 cask, Unit 2, was missing.

The thermal shield has now been replaced bringing B-3 cask, Unit 2, into compliance with Certificate of Compliance No. 6058.

Unit 3 remains in an out-of-service status.

Please feel free to contact me directly should you desire any additional information.

Sincerely, NUCLEAR ENGINEERING COMPANY, INC.

^~

Thomas S. Baer Vice President

,. r '

{garp

=

HN[-

[3 TSB/bt g-

.. c c

~ ~

1699 557 c-

-a -

-Ta n u 2so 3 '//

14565