Forwards Two Deficiency Repts Re Small Break Reactor Coolant Pump Operation Interaction & Reactor Bldg Spray Piping Supports.W/O Encl
ML19260A459
Person / Time
Site: Midland
Issue date: 10/23/1979
From: Gibbs M
ISHAM, LINCOLN & BEALE
To: Cowan F, Linenberger G, Smith I
Atomic Safety and Licensing Board Panel
References
NUDOCS 7911210185
Download: ML19260A459 (1)


Text

e ,  !

- . . .NRC PUBLIC DUCUME'Af RMM

  • , . ISHAM, LINCOLN & BEALE COUNSELORS AT LAW P- L e g CC Q .

ONE FimST NafiCNAL mLAZA romtv SCCCNC FLCon CMcCAGO,iLLINoss 4C603 E

TELCPwCNC 3 2 S54-7900 TELEX: 2-52 88 wa seessed ?C N 3 rr'C C octo er? Stet t?. 'e w.

grytsetse P600m October 23, 1979 ****;'*S*di'o*

Ivan W. Smith, Esq. Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Atomic Safety and Licensing Bd. Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Comrtission Washington, D.C. 20555 Washington, D.C. 20555 Dr. Frederick P. Cowan Apt. B.-12 5 6152 North Verde Trail Boca Raton, Florida 33433 Re: Consumers Power Company (Midland Plant, Units 1 and 2)

Docket Nos. 50-329, 50-330 Gentlemen:

Enclosed are two S 50.55 (e) reports which have recently been submitted by consumers Power Company to the Nuclear Regulatory Ccmmission.

Very Truly yours '

] -: fb q0hD)<!!-l4 8w$

. artha E. Gibbs MEG: em / c cht Enclosures cc: Service List w/

Enclosures N rg h

m

#a s

p&G*4- ?

a 4: ,

1382 167

. 7011 210 /- 48S'

I ,

COIISumBTS i([: POW 0r azurEn # ^%ezvCa 5**""-*

e CD@W Semor Vice Pernient General o ffices: 1945 West Pernait Road, Jaceson, Micmigen 49201

  • LS1 ?) 7884453 October 19, Isrr9 Ecue-271-79 Mr J G Keppler, Regional Director f 2 Office of Inspection and Enforce =ent /3' a h US Nuclear Regulatory Cc==issicn Region III 2-y W;d
  • h g'1% > ' s 799 Rcosevelt Road ,g% , gj j Glen Ellyn, IL 60137 - c,G, .jp

~4 % % '*

s j

. M TD liUCLEAR PLA?;T - $s. U' WIT No 1, DOCKET NC 50-329

UNIT ::0 2, DOCKET No 50-330 cs

._ SMALL EREAK/ REACTOR CCCLANT PUt'2 OPERATION I::TERACTICN

Reference:

S H Havell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Dceket No 50-329; Unit No 2, Dochet No 50-330; S=all Break /Reacter Coolant Pu=p Operatica Interaction; Serial Hove-221-79; dated August 15, 1979 In accordance with the require =ents of 10 CFR 50 55(e), this letter ccustitutes a second interi= report concerning a pctentially unsafe situation with respect to the tripping of reactor coolant pu.:ps during certain primary syste= high void fraction conditions. This situaticn was described in reference 1.

After careful study of the 3&W analysis of this conditien, and based upcn their recc==endatien, CPCo has decided to incorporate a safety grede eutcestic reactor coolant pump trip syste= in the Midland design which vill ensure 10 C7R 50 Appendix K criteria vill be =et during all postclared s=all break scenarics. Cn Septe=ber 14,1979, 36W was authcrized to develop design criteria and trip icgic, and 3echtel was instructed to proceed with design and precure=ent. The schedule for cc=pletien of this effort is under develop =ent.

Ancther report, either interi cr final, vill be sub=itted en or before February 8, 1980.

m m d" V&

l bb l [1b WR3/lr CC: Director of Office of Inspection & Enforcement Director, Office of ManaEe=ent Att: Mr Victor Stello, USURC (15) Informatica & Pregrs= Centrol, USNRC (1) m.

.- .-. 94 D

D0 ' ] } l Y

/

2 Ecue-271-79 3CC: JLBacen, M-1085A RC3au=an, P14 h12 WR31rd, JSC-2163 JLCoricy, Midland LHCurtis, Bechtel AA GSKeeley, Pik kO63 CDiahaney, E&W EkHarguG11o, JSC-220A DEMiller, Midland JARutgers, Bechtel AA TJSullf. van, P2k-62kA Mmibbs, H&B File: 0.4 9 26 1382 i69

/. .

~

~

r=

consumers i.8kM U

power Stephen H. Howeit sensor Vice Pwssdent General O ffices: 1945 West Parnell Road, Jacuton, Michigan 43201 . (5171 783-0453 October 19, 1979 Heve-272-79 Mr J G Keppler, Regicnal Director Office of Inspection and Enforcenent US Nuclear Regulatory Cc==ission Regien m 799 Roosevelt aced Glen 71'yn, IL 60137 MIDIA:iD NLU R PlAUT U M NO 1, DcC:s No 50-329 UIC NO 2, DCCKET NO 50-330 REACTOR SUIlDING SPPAY PIPING SUPPCICS

References:

1) S H Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Decket No 50-330; Reactor Building Sprey Piping Supports; Serial Ecue-131-79; dated May 1,1979
2) G Fiore114 letter to S H Ecuell; Docket No 50-329 and Docket No 50-330; dated May 23, 1979 Reference 1 was a final 50 55(e) report en the analysis of Reacter Building Spray Piping Suppcrts. Subsequent to the final report, we deter =ined that further verifications were required in that there vere apparent variances frc=

the desi6n drawings for the six ring girder anchers installed in Unit 2, and ve advised ycu cf this conditien via a telecen en "cy 18, 1979 Reference 2 is ycur acknculedsnent that we regaired further reviev cf this stter.

As identified previcus1;y, there are 16 anchers per unit. Ten anchers are located directly en the dcne with the renaining c1x anchers per unit located en the appropriate unit's ring girder. As identified in the previcus repcrte, it vos believed that the 10 dere anchers in Unit 1 and all Unit 2 anchcrs had been installed according to design drawings. Subccracnt to finding the variances in the six ring 61rder anchors, a review of field incpection reports indicated that the six ring girder anchcr: had not been inspected end that the 10 dc=e anchers, per unit, had been inspected includi:6 a validcun by the En61neering Stress Group.

As-installed dimensional details of the Unit 2 ring girder anchors were forvarded to ITT Grinnell for analysis on Septe=ber 14, 1979 Additional acticus are as follcus:

I h- , 170

"' ~

so D

a5 3 3" l

. Hove-272-79

~

1) co=pleted by Nove=ber 5, 1979ITT Grinnen o beanalysis of the Unit 2) te deter =ined after receipt of the results e erefore analysis.

of the Grin 3) there vill =ost likely be a need foreen=edificatien installed, of thFc design,insta during which win be precessed thrcu6h established 6 n ation. e cr11nal project precedures Ancther report vill be provided on or before Dece=ber , 1979. 21 ns/tr CC:

Director Att: of Office of Inspection F.c D: force =ent MrVictorStello,IE2C(15)

Director, Office of Management Infor=ation and Program Centrol, USIGC (1)

ECC: JLBacen, M-lC85A RC2au=an, Pik-hl2 W Bird, JSC-216B TCCecke, Midland JLCorley, Midland IECurtis, Eechtel AA LADreisbach, Bechtel-Midland