PMTTAMf7EIA ELECTRIC COMPANY Pem h Bottoma Atoutie Power Station Delta, Pennsylvania 17314 october 19, 1979 ler. Boyce H. Oriuc Office of Inspection and Enforcement Region 1 United States Nuclear Regulatory Coassission 631 Park Avenue King of Prussia. PA 19h06 8UBJECT:
REPORTABLE OCCURRENCE - PROMPT NOTIFICATION Confirming J. K. Davenport's conversatio.2 with Mr. Greenman, Region 1, United States Huelear Regulatory Coasaission on October 19, 1979 Referencer Docket No. 50-278 Peach Bottoes Unit 3 Technical Specification References 2 6.9 2.a(9)
Report No. 3-79-29/IP Cec w e Date:
October 19, 1979 Identification of Occurrence;
.The piping systems inspection and measurement program being conducted in response to IE Bulletin 79-1h has identified a dasanged sway strut on the "C" Reactor Feed Pump discharge line.
Sway strut 3-600-82 was found to have a cracked rod end.
Apparent Cause of Occurrencer Under investigation.
Analysis of Occurrence:
During routine T9-lh inspection procedures, a sway strut associated with the Unit 3 "C" Beactor Feed Pussp discharge line was found to have a cracked rod end. Unit 3 reactor is in the cold shutdown conditton for refueling and startup will not be initiated until the probles has been corrected.
Corrective Actient A new sway strut has been ordered to replace 3-600-82, and is expected to arrive Tuesday 10/23/T9 Corrective action will be-implemented prior to initiation of startup of Unit 3 reactor.
b 7911080
-2=
Previous Failures:
2-79-33/IP 2-79-37/IP 3-79-19/IP 3"79-23/IP 3-79-25/IP 3-79-:4!i/IP 26T9-M/1P 3-79-30/IP 3-79-31/1P FT9-32/1P Very truly youre, y 7td I W. T. Ullrich Stat. ion Superintendent.
W1'Uscat c