ML19260A169
| ML19260A169 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/28/1977 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19260A170 | List: |
| References | |
| GQL-0554, GQL-554, NUDOCS 7910290776 | |
| Download: ML19260A169 (2) | |
Text
_ _ _....
NRC ennu 195 (3 781 u.s. NUCLE AR REGULATORY CC ISSloN ooCirE T NUMas se
- 2. 8 h,
p dRC nlSTRIBUTION FoR PART 50 DOCKET MATERIAL TO:
FROM:
DATE oF ooCUMENT Metropolitan Edison Company 4/28/77 Mr. R. W. Reid Reading, Pa.
DATE REcEivEo R. C. Arnold 5/12/77
.[hR f CIN AL
.ETTER MoToml2ED PROP INPUT FORM NUM8ER ^ PIES PECEIV E D g' NCLAS$4FIED OCoPY A
f =_ ".
{_
DESCRIPT4oN ENCLoSU RE i
Ltr. w/ attached Certificate of Service..
..trans the following:
Amdt. to_OL/ change to Appendix A tech, specs...notorized 4/28/7.7..not to requi're
~~-^ Q~J?
the Unit Superinte'ndent c forward copies
, M _.
. e of change / modifications eTeiluations tb the 1 _,
Manager-Generation Engineering in cases when r.he CTSS has already completed & documented their evaluation of the change / modification..
. u v :.
m.,..
s
~4u v,,g PLANT NAME:
~~
1480- 277 3
Three Mile Island U. nit No. 1
,(2-P)
(12-P)
'RJL '
Cy$
MG SAFETY FOR ACTION /INFOR.'.1 ATION c'nrTon ASSIGNED AD:
A R R Tc'TD in.
s JJ2ECH CHIEFr ftt d. t 51 nnisru cuter.
i
, PROJECT MANAGER; Z oo e f r, s (
PROJECT MANAGER:
~
~
/ LIC.-ASST. ;
Q t 4-7 m LIC. ASST.
l I
INTERNAL DISTalBI: TION k~PFneTTrT i
SYS"TEMS SAFETY I
PLANT SYSTEMS I
SITE SAFETY &
/,NRC PDR
'HEINEMAN I
TEDESCO I
ENVTPO A"AlVETs
/ I&E(4 SCHROEDER I
BENAROYA i
DENTON & M~T i r't
/ OELD f>TH9
/ GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TrCT2 MIPC
- MAC.1RRY
'<TRKWOOD ERNST CASE BOSNAK BALLARD
/HANAUE R SIHNEIL l
OPERATING REACTORS YOpiG3LOOD HARLESS PAWLICKI 1
STELLO I
SITE TECH.
PROJECT MANAGEMENT l
REACTOR SAFETY l
OPERATING TECH.
I CAMMILL BOYD i ROSS.
1/.
EISENHUT I
STEPP P. COLLINS NOVAK
/t SHAO HULMAN HOUSTON ROSZTOC2Y
/l BAER PETERSON
/
CHECK
/
BITTLER SITE ANALYSIS 8
MELTZ
/
CRIMES VOLQER HELTEMES AT & I BUNCH SKOVHOLT SAL _TZMAN
/
J. COLLINS RUTBERC l
KRECER n
EXTEHNAL DISTRIBUTION CON THOL NUMBE H g J.PDR ; /4.,v. s a y, '/'-~
NAT IAB:
BRQQK!!AVEN MAT TAR N910290y$#$
g TIC:
REC _V.IE ULRIKSON (ORNL) g NSIC:
IA_PDR 771M0035 A
7 SLB:
CO t ULTAjg; _ o ACRS /(p YS HCLDENc/
T C
VO-
/
- M
'.E
- _au
/
/
METROPOLITAN EDISON COMPANY wn:oe ce crucn.u rum;rn wemmcarwm,
POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 April 28, 1977 GQL 055h
' c_
x p; -
, ~ }. *3 n w, ;1. v.a R - -
~-
.{
8==
. l,'
]
'5- { ;-; crr g Direetcr of Nuclear Reactor Regulation V.
g Attn:
R. W. Reid, Chief L:
f)
Operating Reacters Branch No. k
<,,,..y, g @/
U.S. Nuclear Regulatcry Co =ission Qt Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, tr it 1 (TMI-1)
Docket No. 50-289 Operating License No. DPR-50 Technical Specification Change Request No. 53 Enclosed are three signed originals (sixty confer:ned copies sent separately) of Technical Speciff Jation Change Request No. 53 requesting amendment to Appendix A of Operating License No. EPR-50.
Also enclosed is one signed copy of Certificate of Service for proposed Technical Specification Change Request No. 53 to the chief executives of the township and county in which the facility is located.
Sincerely,
/s/ R. C. Arnold R. C. Arnold Vice President RCA:JMC:rk
Enclosures:
1)
Techni a1 Specification Change Re<1uest No. 53 2)
Certifleate of Service for Techr.ical Specification Change Request No. 53 1480 278
-