Nonroutine 30-Day Rept 75-02 Re Buildup of Radioactive Gases in Auxiliary Bldg.Four Valve Leaks Identified.Work Requests Submitted for Three Leaks in Makeup Valve Alley,Elevation 281 Feet.Fourth Leak in Hays Gas Analyzer Room
ML19259D525
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/28/1975
From: Creitz W
METROPOLITAN EDISON CO.
To:
References
75-02, 75-2, GQL-0991, NUDOCS 7910240786
Download: ML19259D525 (3)


Text

,

NRC IPSTRIBUTION FOR PAPT 50 DOCKET _M ATERI AL g . , _. , (TEMPORARY FORM) f 7 g . g.-

I ' "

CONTROL NO-FILE: 4//'/J^b F ROM:!!e tropolitan Edison Co. DATE OF DOC DATE REC'D LTR TWX RPT OTHER Reading, Pcnna. 4-28-75 5-1-75 XX ya c, a TO: OR!G CC OTHER SENT AEC PDR ^

A. Giambusso 1 Signed xxx SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

xxxxx 1 50-289 DESCRIPTION: ENCLOSURES:

Ltr. rept additional info concerning Abnorm.

Occurr. (Envior. ) # 75-02, on buildup of Radi ) active gases... -

Investigations resulted in ident. of four .

sources of leakage......

g**D "D WN

~

~

koo o h.. S $ l"/'s .a PLANT NAME: ThreeMileksland#1 FOR ACTION /INFORMATION VCR 5-5-7"r BUTLER (L) SCHWEi4CE R (L) ZIEMANN (L) /3EG AN (E)

W/ Copies W/ Copies W/ Copies / W/2 Copies CLARK (L) STO LZ (L) DICKER (E) / LEAR (L)

W/ Copics W/ Copies W/ Copies / W/.k'ooies PAP A !L) VASSALLO (L) KN!GHTON (E) SPElS 7.'/ Cupio C/ Cupn.n, in Ownes vu Copies

  • KNIEL (L) PURPLE (L) YOUNGBLOOD (E) LICENSI::G PROJECT !!ANAGER W/ Copics W/ Ccpics W/ Cepies W/ Copies o INTERNAL DISTRIBUTION hR4EEM f,NBCFOR TECH SCHROEDERREVIEW jGRIMES DENTON LIC ASST.
  • A/T IND -

8 R AITM AN R. DIGGS (L)

OGC, ROO.*A P 506A MACCARY G AM '.il LL H. GEARIN (L) SA LTZM AN GOSSICK/ST AF F KN!GHT ,- K ASTN E R E. GOULBOURNE (L) MELTZ CASE - DAW LICK! p,/BALLARD P. KREUTZER (E)

GIAM OUSSO SHAO SPANG LER J. LEE (L) PLANS BOYD STELLO M. MAIGRET (L) MCDONALD MOORE (L) HOUSTON _ ENVIRO ,/S. R E ED (E) ((p} CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUBE (L:r)

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSCN P. CO LLINS TEDESCO YOUNG B LOOD H. SMITH (L) HARTFIELD (2)

DENISE J . C01. LINS REGAN S KLECKER

/ REG OPR / LAINAS PROJECT LDR ! . TEETS (L) (h G. WILLI AMS (E) EISENHUT

- FITE & REGION (2) BENAROYA j/ M !M +.) V, WILSON (L) WIGGINTON , ,

,/ i , ,

VOLLMER j r H AR LESS R. INGRAM (L) /jd44-5 t4 "#

./ -

IXTERNAL DISTRIBUTIDN I .J N.f_

f e 1 - LCCAL PD R/I$t /d/_ b f1

,A - TIC (ABERN ATHY) ( 1)(2)( * ) - NATION AL LACS '0, gf%f 1 - PD R S AN/'. A 'N Y

  • /1 - NSIC (BUCHAN AN) 1 - W. PENNINGTON, Rm E 201 GT 1 - CROOKH Av'_ . N AT LAS 1 - ASLB 1 - CONSU LT ANTS 1 - G. U L H I KSU N 0 ;": L 1 - Newton Anderson NEWMARK/8LUME/AG CAbl AN 1 - AGMED (RUT H GUS3 MAN'

- ACRS HOLDING /SENTh-h7 Rm 8127 GT 1 - J. D. RU N K L E'S, P .. E-20 i 1459 357 OT 7910240 7k S

m.. _

[M

$y PCwfR F;w .*nOGRiss METROPOLITAN EDISON COMPANY POST CFFICE BOX 542 RE ADING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 Mr. A. Giambusso, Director April 28, 1975 Division of Reactor Licensing GQL 0F91 U. S. Nuclear Regulatory Cc= mission Washington, D. C. 20555 Mr. J. P. O'Reilly, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, Pennsylvania 19h06 Dear Sirs-Docket No. 50-289 Operating License No. DPR-50 Nonroutine 30-Day Report 75-02 This follev-up report is being submitted in accordance with our original report of April 2,1975 (GQL 0892) and deals with a buildup of radioactive gases in the Three Mile Island Nuclear Station (TMI-1) Auxiliary Building.

Investigations in the Auxiliary Building with the ventilation secured has resulted in identification of four sources of leakage. Three of these have been traced to specific valves or combinations of valves. These three sources are open-ended funnels designed to col]ect valve stem leakoff and are locrited in the Makeup Valve A11ey-281 ft. elevation (MU-V-12, MU-V-76A, MU-V-89A, MU-V- 90), northeast corner of the Auxiliary Building at Reactor Building-305 ft. elevation (MU-V-16C, MU-V-160), and northeast corner of the Auxiliary Bui'diug at Reactor Building-281 ft.

elevation (DE-V-12A). The fourth area of le9kage has been determined to be within the Hays Gas Analyzer Room-305 ft. elevation. As the specific valve or fitting causing leakage has not yet been determined, sampling is continuing to determine the 1ccation and cause of the leak.

Work requests have been submitted to secure the leakage for the first three sources noted above. When the source of the fourth is determined, appropriate corrective actica vill be taken. Once all known leaks are determined and corrective action taken, a check vill be made with the ventilation secured to insure that the baildup has been terminated.

It should be noted that the lnak rates involved are of approximately 0.002-0.003 gpm (as calculated frcm concentrations released and primary coolant activity and verified by visual inspection) are well belev the technical specification limits for noble gas releaces and that no personnel or public hazard exists due to low-level buildup from the leakage.

1459 358 s, 7. vc

,. . , ' ~'.

~

We trust this adequately answers any questions you r.ay have.

Sincerely, W. M. ir tz President W.C : RSB :lw File T.7.3.6.1 20.1.1 1459 359