ML19259D443
| ML19259D443 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/23/1978 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | OFFICE OF THE FEDERAL REGISTER |
| References | |
| NUDOCS 7910240593 | |
| Download: ML19259D443 (1) | |
Text
_
UNITED STATES
[ ease
' ' NUCLEAR REGULATORY COMMI .ON o,,
WASH 9NGTCN, D. C. 20655
(
c; 3 L.~,
E f
&;*Y p
thy 23,1978 CFFICE OF THE SECRETARY Director Office of the Federal Register National Archives and Records Service Washington,D.C.
20403
Dear Sir:
Enclased for publication in the Federal Register are an original
^
anc t'.vo certified copies of a document entitled:
METROPOLITAN EDISON COMPANY, ET AL.
Docket io. 50-289 NOTICE OF ISSUANCE OF AMESBMENT T FACILITY OPERATING LICENSE
=
s Publicatien of the abcve document at the earliest possible date would be acpreciated.
This material is t6 be charged to requisition number D-149.
Sincerely, Samuel J. Chilk Secretary of the Cctrmission
Enclosures:
Original and 2 certified copies bec: l' L._ _ m ; _ _ - :1 1459 086 Public Affairs Executive Legal Director Office of.Concressional Affairs Office of the General Counsel SECY - C&R Branch O'
79102y P
t 3
3 7590-01 UNITED STATES N'ICLEAR REGULATORY COMMISSION DOCKET NO. 50-289 METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 40 to Facility Operating License No. DPR-50, issued to Metropolitan Edison Company, Jersey Central Power and Light Company and Pennsylvania Electric Company (the licensees), which revised the license and its appended Technical Specifications for operation of the Three Mile Island Nuclear Station, Unit No.1 (the facility) located in Dauphin County, Pennsylvania.
The amendment is effective as of its date of issuance, I
This amendment reduces the allowable measured neutron flux tilt,
}
the allowable axial power imbalance and the allowable position limits for the Axial Power Silaping Rods, i
I This amendment also adds a license condition which requires j
I comparison of measured and predicted powar distributions after about i
25 effective full power days of operation in this operating cycle.
The applications for the amendment comply with the standards and l
requirenents of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations.
The Commission has made 1459 087 79/022o i
inwne %qgY 77IlhJJw M
f ui
+
<T l
7590-01
, appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and erwironmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the applications for amendment dated May 10 and 16, 1978, (2) Amendment No.
40 to License No. DPR-50, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D. C. and at the Government Publications Section, State Library of Pennsylvania, Box 1601 (Education Building), Harrisburg, Pennsylvania.
A copy of items (2) and (3) may be obtained upon request addressed to I
the U. S. Nuclear Regulatory Commission, Washington, D. C.
- 20555, j
Attention:
Director, Division of Operating Reactors.
{
Dated at Bethesda, Maryland, this 19th day of May 1978.
i FOR THE NUCLEAR REGULATORY COMMISSION gh
- l DW Robert W. Reid, Chief I
Operating Reactors Branch #4 Division of Operating Reactors 1459 088 l
t
)
si