ML19259D407

From kanterella
Jump to navigation Jump to search
Forwards 750709,0617,13 & 16 Proposed Tech Spec Changes Re Supporting Analysis,Scram & Rod Block Set Points, Administrative Controls,Vent Header Sys & Tendon Surveillance Insp,Respectively.W/O Encl
ML19259D407
Person / Time
Site: Peach Bottom, Crane  Constellation icon.png
Issue date: 07/30/1975
From: Teets S
Office of Nuclear Reactor Regulation
To: Blanco R
ENVIRONMENTAL PROTECTION AGENCY
References
NUDOCS 7910240418
Download: ML19259D407 (2)


Text

I.

f July 30, 1975 50-277/278/289 suxTrvunirYE Docket No.

DISTRIBttrION:

Mr. Robert Blanco Bavironmental Protection Agency - III Dockets (3)

ORB 73 Rdg 6th and Natant Street SATeets FM1mAm1phia, Feensylva in 19106 SEE AN SEET

Subject:

The following documents concerning our review of the subject facility are transtritted for your information:

D**

  • D T

Notice of Receipt of Application.

oj cw b

Draft Environmental Statement, dated b

Final Er.vironmental Statement, dated Safety Evaluation, or Supplement No._ _, dated Notice of Ilearing on Application for Construction Permit.

Notice of Consideration of Issuance of Facility Operating License.

Application and Safety Analysis Report, Vol.

Amendment No.

to Application /SAR, deted __

Construction Permit No. CPPR-

, dated Facility Operating License No. DPR-

, dated Proposed Technical Specifications, or Change No.

,ds*ed Other:

Direc'. orate ot Licensing

Enclosures:

As stated 1459 014 ORBf3 SATeets:kaf 7/

/75 7910240 7y

J

~

A

, PHILADELPHIA ELECTRIC COMPANY DOCKETS NOS. 50-277/278 Proposed tech spec change regarding supporting analysis for the SETAB based tech specs.

Dated July 9, 1975.

Proposed tech spec change regarding the scram and rod block set points at low core flow.

Dated June 17, 1975.

METROPOLITAN EDISON COMPANY DOCKET NO. 50-289 Proposed tech spec change regarding administrative controls section of the e<:isting tech specs and conformance with the Standardized Tech Specs.

Dated June 13, 1975.

Proposed tech spec change regarding operational capabilities of the existing vent header system are fully realized.

Dated June 13, 1975.

Proposed tech spec change regarding tendon surveillance inspection.

Dated June 16, 1975.

t 1459 015 t---

-