8.'CD g
PRELIMINARY NOTIFICATION Sep t e=ber 25, 1979 PRELIMINARY NOTIFICATION OF SAFEGUARDS EVENT --PNS-IV-79-01 This preliminary notification constitutes EARLY notice of events of POSSIBLE national security or public interest significance.
The information presented is as initially received without verification or evaluation _end is basically all that is known by IE staff _as of this date.
Facility: Kansas Gas & Electric Company (KG&E)
Wolf Creek, Unit 1 (.SNUPPS)
Docket No. STN 50-482 DnfD rels fP' fili Subj e cc:
BOMB THREAT Q!d g
- =
- Gl H e s i L, At 7:47 a.. on September 22,.1979, a bomb threat call was received by a Daniel International Corporation talephone switchboard operator / security guard.
It was a long distant toll call (cost $1. 05).
A male caller stated, "I've planted a bomb in the Fuel Building and Aur Building.
We're going to blow this place up once and for all," then hung up.
The voice was calm, young, clear of background noise, and sounded as if a note was being read.
A search by the project security force failed to disclose a bo=b.-
The work force was allowed to leave the site if they desired, however, an evacuation was not required.
The Cof f ey County Sherif f was notified.
A man on site with a similar voice is being cheeved out af ter being late for work (1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) on the day of the call.
The FBI and ATF, Kansas City, have been notified.
No press release was made or planned by the licensee or NRC.
~he site c nstruction progress is currently reported at 36% co:plete.
There 5 :: 3NM en site.
This Ptelininary Notification is issued for information only and no further 1;;1cn by IE is anticipated.
Esgie- !V, Arlington, Texas, received notification of this occurrence by tC.eph:ne from the OA site Manager, KGSI, at 12:15 p.c. on Septenber 22, 1979.
n.e :: Meadquarters Duty Of ficer was notified on September 22, 1979.
IAT was netified on September 24, 1979.
Cont::::
C.
Oberg, RIV 334 2411; W.
Crosssan, RIV 334 2411 Distribution:
Transmitted H St.
/ /0 n sf, Chair =an Hendrie Casaissioner Bra 8 ford S. J. Chilk, SECY Cc= issioner Kennedy Coc=tissioner Ahearne C. C. Ka= merer, CA Co==1ssioner Gilinsky ACRS (For Distribution) 7
-)
a
$ 1 I.
4
~
~
CONTINUED 7 01018 0 9' c-ca
s PNS-IV-79-01 September 25, 1979 Continued Transe.itted: MNBB L. V. Gossick, EDO ~// #1 og, P. Bldg.
IE:X005 (IE:HQ Di:
H. R. Denton H. L. Ornstein, EDO R C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR Landow (6 min /pagt N. M. Haller, MPA D. Vassallo, NRR
J. J. Cum:nings, OIA R. G. Ryan, OSP D. Eisenhut, NRR H. K. Shapar, FLD SS Bldg. 3M2 m, (MAIL)
W. J. Dircks, 10'.SS R. Minogue, SD S. Levine, RES IE:XOOS PRELIMINARY NOTIFICATION
^
. ea u
V
.