ML19259C839
| ML19259C839 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/02/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Vollmer R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19259C838 | List: |
| References | |
| NUDOCS 7908150613 | |
| Download: ML19259C839 (1) | |
Text
.
~
DISTRIBUTI0tl
_ Central Files
., s31%
flRC PDR PSB Reading
's
/
- 4EMORA?iDuti FOR:
R. Vollner, Assistant Director for Systematic Evaluation Program, D0R FR0!!:
G. Lainas, Chief, Plant Systens Srinch, D0R
SUBJECT:
T'11-2 CCilTAII!:tEllT IriFOR"ATIOil The enclosed note from :1. Chiranal, Plant Systens Sranch, is subnitted in response to your menorandum dated June 14, 1979, on the study of equipnent in the cont.ainment of T!!I-2 subsequent to entry into containnent.
G. Lainas, Chief Plant Systens Granch Division of Ocerating '.cactors
Enclosure:
As stated cc w/ enclosure:
J. Eisenhut S. Grines D. Tondi M. Chiranal 7 90815 cG(3 Usezas n
n i S : DOR B DOR..
PSB:DCR),y_t o,,, c..,
c "Ch i ramal : cn' gn..
, L....n a s..
7/./79 7/\\// 79 7/j/79 N1LC PORM 318 (9J6) NRCM 2440 8 e.e. s eve *au s a r **' ave =* o** *c s : it'*-***-r**