ML19259C784
| ML19259C784 | |
| Person / Time | |
|---|---|
| Site: | 07002219 |
| Issue date: | 06/05/1979 |
| From: | Crow W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Norberg J NRC OFFICE OF STANDARDS DEVELOPMENT |
| References | |
| NUDOCS 7908150163 | |
| Download: ML19259C784 (1) | |
Text
f t.'
CYbWC'S &$'
a ata o,
UNITED STATES
+
! N*T.a (
}
NUCLEAR REGULATORY COMMISSION g
- .{g
- C W ASHINGTON, D. C. 20555 s,~!?w j
JUN 0 5 ;;79 ME"CRA?IDUM FOR:
J. A. florberg, Chief Engineering Methodology Standards Branch Division of Engineering Standards FROM:
W. T. Crow, Section Leader Uranium Fuel Fabrication Section Fuel Processing & Fabrication Branch Division of Fuel Cycle and Material Safety
SUBJECT:
REQUEST FOR TECH!11 CAL ASSISTAfiCE (DOCKET NO. 70 g i The services of D. P. Notley are requested for the fire safety review of "the enclosed license application from Exxon Nuclear Company for the Experimental Test Facility (ETF), a laboratory scale laser isotope enrichment operation.
The following is the current schedule for this review. We would appreciate it if every effort is made to meet these ates.
- ction Completion Date Initial fire safety review Jun' 7, 1979 Final fire safety review August ;t v79 A member of my staff has discussed this request with Mr. flotley, who has perfomed fire safety reviews for us in the past.
If the license applicaticn is acceptable, we plan to issue a license that would authorize construction of the laboratory, but would not authorize operation until a site visit is made to review the completed laboratory. If you should have any questions in the interim, please contact R. Stevenson (x74103) of my staff or me (x74240).
Y W. T. Crow, Section Leader Uranium Fuel Fabrication 3ection Fuel Processing & Fabrication Branch Division of Fuel Cycle and Material Safety
Enclosure:
As stated gg f
3 7f08150' n
g