ML19259C768
| ML19259C768 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/29/1979 |
| From: | Aswell D LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| LPL-11410, NUDOCS 7908150145 | |
| Download: ML19259C768 (3) | |
Text
.
- m]
.nza E
ev 7'
k l_OUIS1ANA P O W E R & L I G H T! A c ecx ecce. NEn cptEAs.s tcustsNr. 70174
,42 c w ce.cs s w er O
. ec4135s-2345
.amm wcces sau r-.
UT.Uris sys*Eu a L A3 et; June 29, 1979
. <. a-.s.m % c --
LPL 11410 Q-3-A20.03.13 3-A1.01.04 Mr. Karl V.
Seyfrit, Director Region IV U. S. Nuclear Regulatory Cocaission Of fice of Inspection and Enforcecent 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 SUBJECT : Waterford SES Unit No. 3 Docket No. 50-382 IE Bulletin 73-12 and Supplements73-12A and 73-123 REFERENCE :
(1)
Letter from D. L. Asvell to Karl V. Seyfrit, LPL 11134 dated >hy 25, 1979 (2) Letter from A. E. Scherer to H. D. Thornburg, LD-79-024 (3)
C-E Report "Information Requested by LE Bulletin 78-12" dated June 8, 1979 ATTACHNINT:. Certification from C-E dated June S, 1979 i
Dear Mr. Seyfrit:
We are submitting our final response to the subject bulletin (IE Sulletin 73-12 as modified by Supple =ents73-12A and 73-123) as cc =itted in our reference (1) letter.
Cochustion Engineering (C-E) the reactor vessel ranufacturer for Waterford 3 has submitted to the NRC a generic report, unich was a product of their records search, by way of the reference (2) letter.
Responses to the itecs of concern in II Sulletin 78-12 as Supplemented by 73-12) for Waterford 3 are addressed in Section III of the reference (3) report with references being made to the information provided in Sections V, VI, 7II, VIII and EX.
Applicability of these responses to Waterford 3 is verified by the list-in; in Section I7 of the reference 3 report.
Louisiana Power & Light Co=pany 's Waterford 3 facility is listed along with C-E's contract nu mb e r (74170) and tne applicable AS'E code.
Also, attached is a copy of the certification frt, C-E that cartifies that the report addresses all the applicable material used ic the fabrication of the Waterford 3 reactor vessel as requested by IE Eulletin 78-12.
LDSID 7 908150 l4 C
Mr. Karl V.
Seyfrit Page 2 June 29, 1979 Louisiana Power and Light Cocpany feels that the information contained in the above mentioned report and certification does accertain that C-E's Quality Program has effectively prevented such an incident as addressed in subject bulletin, the use of atypical weld materials, in the fabrication of the Waterford 3 vessel.
If you have nay questions, please advise.
Yours very truly,
^ / )'
p D.
L. Aswell DLA JEH: s=d Attachment cc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C. 20555 g
d h
)
%,s.
- C E Power Systems Tel. 615/2 65-4631 Combu tion Engineering, Inc.
' 911 W. Main Street Chattancoga. Tennessee 37402 mm POWER ELS SYSTEMS June 8, 1979 I hereby certify that the record search required by I.E. Sulletin 78-12 and 78-12A has been completed and that, to the best of my knowledge and belief, the report submitted to the NRC on June 8, 1979, entitled, Information Requested by NRC Inspection and Enforcement Bulletin No. 78-12, " Atypical held Material in Reactor Pressure Vessels", addresses all of the applicable materials used in the fabrication of the folloying reactor vessel:
C-E Contract No.:
74170 Utility / Site:
Lcuisiana Power Waterford 43
/l>
,rf f
' f(
- 4 W.
A.
- Stone, Jr.,
Manager Nuclear Quality Ascurance Chattanooga Nuclear Cperations O
g, = v.< g
- d s.'.E