ML19259C710

From kanterella
Jump to navigation Jump to search
Forwards LER 79-023/03L-0
Date released: 09/30/2019 Download: ML19259C710


LER 79-023/03L-0 on 790701:during Power operation,3B Charging Pump Experienced Package Failure & Excessive Seal Leakage.Caused by Failure of Primary & Secondary Packing. Packing Was Replaced & Pump Tested
ML19259C716
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/31/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C716 (1)
Forwards LER 79-023/03L-0
ML19259C709
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/31/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C709 (1)