Notifies of RO 2-79-35/1P on 790706:per IE Bulletin 79-02 Insp,Found 13 Failures of shell-type Anchors Associated W/Horizontal Supports on Emergency Cooling Water Piping. Caused by Impropr Installation.Anchors Replaced
ML19259C612
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/09/1979
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7908010456
Download: ML19259C612 (2)


Text

T-6 THIS DOCUMENT CONTAINS P00R QUALITY PAGES PillIADEIJ'lli A CIT.CTar C Omst v.Y Fesch 14ot t o=> At twe i t F u a r Se it i <m Delt a. Fmn s y I wan i. 2 17314 July 9, 1970 Mr. Soyce H. Grier Office of Inspection and Enforcement-Region 1 United Sgates Nuclear ReguIatorv Cmissicn 631 Park Avenim King of Prussia, PA 19406 SUMECT:

REPORTABI.E OCCJFRENCE - PHOPTT W'ITICATIGi Canfirming af. T. Ullrich's comersat im wi t h Mr..

Archit a l, 'Jagim I on 7/6/79.

Deference:

Docket No. 50-277/279 Peach Iktros thiits 2 :end 1 Technical Speci ficat ion Refe ren ce : 6.9.2.a(91 Report No. 2-79-3S/IP Occurrence Date:

July 6, 1979 Identificatiort of Occurrence:

On July 6, 1979, the anchor invectim progr,2= b= in g pe rfn-,1 in acco rd:m re with rwatuiremtv of IE Mutterin 70 -f12. ident i fied 13 fai l.itres of shall type anchors.

The s e an ch o r. are a l l a s s oc i n t-d w it h ho r i z<vir.a i mqport s on esmergency cooling water piping on the upper dech m the e w rgmcy cooling tower stmeture.

Apparent Cause of Occurrencej

  1. calysis indicates t hat a s i g i fica-t n,mha r of t h= @.11 e v, a an ch o r

.- r iwroperly installed in the grvut beneat h t h-s'Tc'* r* riate instead of f he st ructu ra l concret e.

haalysis of occurrence:-

The inspection prograst was perferw I tre a c co r.I=n c e w i t h

  • n es r a h l i a $ -<* procedure.

There are 47 horironesa! pis*e 5th ore' ms = < > - i n * *.1. w i th ehis piping svsea =.

At I ca r.t one of the four Amnit s ase ricizer.t w it h ea ch **s: ; o rt vt,r-www tou.r o of.

If any one bolt fal leef. the other three bo:t 5 in ehat

=n e. b n e y 1.-r e * :e s :o b -

Sequent ly test ed.

Thi$ result ed in 1 Ten t i fy ing a trtai of ~3 f i l ed s ha l l type anchors.

Th ese were dist ribre ed as follow =:

790801o%st

Orte suscher piste concoln 4 four failures per pinee.

Three anchor pistes contained two fallures per place.

Three anchor plates contained cme failure p-r plat e.

As failures were (med new anchors were i w diate1y inst al ted and succe** fu 11y toripaed to proper values.

The emer,;;ency cooling towr st ructure is uti t i red on;y <br ing *peci fic events such as flood or los< of Connwings' Pond.

The paping i n v.$ 1 ved in this a v.s would only ftsiction during these speci fic event =.

The high pressure se rv i ce water and emergency service wat er operabiliry i s not a f fec t e d.

Corrective Action:

As indicated above, all failed sheII type anchors wa re newdl a t e ly rept <ed and test ed..

Because of the large number or falInres in this a re i. test ing of the remaining bolt s annociated. wit h these horizont al mischar p lat es will be perforward.

All failed anchors will be replace.f.

It is expected that this work can be completed within two weeks.

Previous Failures:

None similar..

Very t ruly yours.

[Jbesj W. T. Ill! rich, Siipertnrendent Peach Bet t e Ar o-s c Powe r Sta t i on Will: 11=