ML19259C522

From kanterella
Jump to navigation Jump to search
Notifies That,Based on NRC Insp Efforts,Util Had Modified License Re Protective Circuitry to Provide Breaker Coordination & Isolation of Onsite Electrical Sys
ML19259C522
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 10/31/1977
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19259C517 List:
References
TASK-TF, TASK-TMR NUDOCS 7906230128
Download: ML19259C522 (1)


Text

.

n;.

=

october 31, 1977 MEMORANDUM FOR:

H. D. Thornburg, Director, Division of Reactor Operations Inspection, IE FROM:

James G. Esppler, Director SU3 JECT:

TOLEDO EDISON CCEPANY DAVIS-BESSE I DOCKET NO. 50-346 Based upon our inspection efforts, we have verified that Toledo Edison Company has modified the protective circuitry to provide breaker coordina-tiori and isolation of the onsite electrical system to permit the required Class 1E equipment to operate in the event of off site grid degradation in accordance with their sub:aittal of July 18,1977 (Serial Number 293) to J. E. Stoltz from L. E. Roe. This submittal to NRR was made in accordance to the requirement of Facility Operating Licenso No. NPF-3 condition 2.C.

(3) (q).

This infor=ation should be transmitted to NRR so that condition 2.C. (3) (q) of the licenso can be amended.

James C. Kappler Director ec:

N. C. Moseley, IE E. L. Jordan, IE 2283

,36 N. M. Haller, IE L

)

}

=

,g g0623 0 l [f