Requests Delay Until 790713 to Determine Reportability of Possible Deficiency Re Failure of Switch Assembly in 4.16 Kv Switchgear
ML19259C201
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/29/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7906140365
Download: ML19259C201 (1)


Text

j- MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi

- " " " " " " P. O. B O X 16 4 0, J A C K S O N, MI S SIS S I P PI 3 9 2 0 5 encouction ocaanturuv May 29, 1979 b3 , NC

- g

-< = :0 eo

  • m Office of Inspection & Enforcement p n U. S. Nuclear Regulatory Commission cc ~2]-

Region II ==

-;y 101 Marietta Street - Suite 3100 o Atlanta, Georgia 30303 to  :'

ATIENTION: Mr. J. P. O'Reilly, Director Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station File 0260/15525/15526 Interim Report No. 2 for PRD No. 79/06 As Defined In 10 CFR 50.55(e)

AECM-79/52 On March 2, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site concerning the failure of a switch assembly installed in the 4.16 KV switchgear. We had ant,icipated that by May 30, 1979, sufficient data would be availa-ble for us to determine reportability as defined by 10CFR 50.55(e).

However, due to additional analyses required, we wish to extend our date for determining reportability until July 13, 1979.

Yours truly, L. F. Dale Nuclear Project Manager JRF:pa cc: Mr. R. C. Travis 2284 125 Mr. R. B. McGehee Mr. T. B. Conner Dr. Ernst Volgenau, Director \h -