Helping Build Mississippi MISSISSIPPI POWER & LIGHT COMPANY P. O. B O X 16 4 0, J A C K S O N, MI S SIS S I P PI 3 9 2 0 5 May 29, 1979 encouction ocaanturuv b3,
NCg
= :0 eo
- m
~2]-
Office of Inspection & Enforcement p
n U. S. Nuclear Regulatory Commission cc 101 Marietta Street - Suite 3100 o
-;y Region II
==
Atlanta, Georgia 30303 to ATIENTION:
Mr. J. P. O'Reilly, Director Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station File 0260/15525/15526 Interim Report No. 2 for PRD No. 79/06 As Defined In 10 CFR 50.55(e)
AECM-79/52 On March 2, 1979, Mississippi Power & Light Company notified Mr. J. K. Rausch of your office of a potential reportable deficiency at the Grand Gulf Nuclear Station construction site concerning the failure of a switch assembly installed in the 4.16 KV switchgear. We had ant,icipated that by May 30, 1979, sufficient data would be availa-ble for us to determine reportability as defined by 10CFR 50.55(e).
However, due to additional analyses required, we wish to extend our date for determining reportability until July 13, 1979.
Yours truly, L. F. Dale Nuclear Project Manager JRF:pa 2284 125 cc:
Mr. R. C. Travis Mr. R. B. McGehee Mr. T. B. Conner h
Dr. Ernst Volgenau, Director
\\
l Office of Inspection & Enforcement
$ h U. S. Nuclear Regulatory Connission g
Washington, D. C.
20555 7906140366
'79//7 UIN Member Middle South Utilities System