Interim Itt Grinnell Rept Indicates That Six Anchors Are within ASME Section III Code Requirements Re Allowable Stress.Addl Rept,Either Interim or Final,Will Be Sent on or Before 790501
ML19259B784
Person / Time
Site: Midland
Issue date: 03/16/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
HOWE-93-79, NUDOCS 7903230158
Download: ML19259B784 (1)


Text

p== %

/VM C00SilmBIS 4/h I POW 8f kg g

Stephen H. Howell Senior L% e IvessJent e

General Of fices: 1945 West Parnall Road, Jackson, Michigan 43201 + (517) 788-0453 March 16, 1979 Howe-93-79 Mr J G Keppler, Regionnl Director Office of Inspection and Enforcement US Huclear Regulatory Cor: mission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAUD HUCLEAR PLAla UNIT I;0 1, DOCKET NO 50-329 UNIT NO 2, DOCKET no 50-330 REACTOR BUILDIIG SPRAY PIPIEG SUPPOICS

Reference:

S H Howell letters to J G Keppler; Midland nuclear Plant; Unit No 1, Docket no 50-329; Unit no 2, Docket no 50-330; Reactor Building Spray Piping Supports -

1) Serial Houe-60-78, dated April 19, 1978
2) Serial Hove-92-78, dated June 13, 1978 3

Serial Howe-154-78, dated August 30, 1978 h)) Serial Howe-186-78, dated October 13, 1978

5) Serial Howe-231-78, dated november 10, 1978 6

Serial Howe-265-78, dated December 15, 1978 7

Serial Hove-36-79, dated February 1,1979 The referenced letters and this letter are interim 50 55(e) reports.

Reference 7 stated that the required analysis, to confirm that the reactor building spray piping supports (anchors) are within the ASME Section III Code allowable stresses, was completed except for six anchors in each unit. For these anchors, the actual time history water hammer loading curves have been applied to more closely provide the actual loadings that would be experienced by the anchors. I'IT Grinnell indicated that the results of this effort have shown these anchort to be within Code requirements. However, the final ITT Grinnell reports have yet to be procesced through the Bechtel Engineering review cycle.

Another report, either interim or nnal, will be sent on or before May 1, 1979

~~

CC: Director of Office of Inspection & Enforcement Att: Mr John G Davis, Acting Director, USNRC (15)

Director of Office of Management 7903230/5 9

.Information & Program Control, USHRC (1)