ML19259B778

From kanterella
Jump to navigation Jump to search
Forwards LER 79-027/03L-0
Date released: 09/30/2019 Download: ML19259B778


LER 79-027/03L-0 on 790225:axial Flux Difference Deviated Greater than 5% from Target.Caused by Xenon Transient Occurring During Startup Operation.Corrected by Boration by Reactor Operator
ML19259B779
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/16/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259B779 (2)
Forwards LER 79-027/03L-0
ML19259B777
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/19/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259B777 (1)