Wayne H. Jens.

Ass.stant V<e President Engmereng and Construct.on Ma.bng Address 3331 W B,g Beaver Acad 2000 Secon;j Awn ue ISOn (Troy Sch.gan 48084 3131649 1117 Detrcat %c hyan 4R?26 January 31, 1979 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Chief, Docketing and Service Section

Subject:

Enrico Fermi Atomic Power Plant - Unit 2 NRC Docket No. 50-341 Environmental Report (Operating License Stage)

Supplement 5

Dear Sir:

The Detroit Edison Company is hereby transmitting under separate cover forty-one (41) copies of Supplement 5 to its Environmental Report (Operating License Stage) with respect to the above-captioned docket.

This submittal contains the responses to the Nuclear Regulatory Commission's Environmental Review Questions as received in letters from Ronald L. Ballard, Chief Environmental Projects Branch 1, dated September 22, 1978 and November 30, 1978.

In addition therero, the Company is submitting three (3) copies each of the documents listed in Attachment I to this letter in accordance with NRC Procedure RPOP 514, Revision 2.

Sincerely, i

W f Gw J

EFM/WilJ/jr OS8025%

ATTACHMENT 1 ENRICO FERMI ATOMIC POWER PLANT - UNIT 2 DOCKET NO. 50-341 Three (3) copies of the following documents are being submitted with Supplement 5 to the Environmental Report (Operating License) under NRC Procedure RPOP 514, Revision 2. These documents are submitted in response to Environmental Review Questions submitted by the NRC in letters dated September 22, 1978 and November 30, 1978.

Site Location and Layout q.1 (September 22, 1978)

Aerial View of Fermi Site Aquatic Ecology q.3, 4 (September 22, 1978)

(November 30, 1978)

Monroe Power Plant: Study Report on Cooling Water Intake Enrico Fermi Power Plant: Study Report on Cooling Water Intake Trenton Channel Power Plant: Study Report on Cooling Water Intake Heat Dissipation System q.1 (September 22, 1978)

Page 3.4-4a Supplement 1, June 1975 lleat Dissipaticn System q.7 (September 22, 1978)

Lagrangian Vapor Plume Model, Version 3, NUS - TM-S-184, NUS Corp., July 1974 Economic Considerations q.1 (September 22 and November 30, 1978)

Prospectus, General and Refunding Mortgage Bonds Series PP Preliminary Prospectus, General and Refunding Mortgage Bonds Series RR Forecasting q.1 (Scotember 22 and November 30, 1978)

a. Michigan Public Service Commission, Evaluaion of the Consumers Power and Detroit Edison 1974 Load Growth Forecasts, MPSC Staff Study 1975 - 1, February 1975
b. National Economic Research Associates, Inc.

Review of Load Forecasting Methodology

c. Theodore Barry and Associates,Section IV Electrical System Planning

ATTACHMENT 1 9

d. Forecast, Electric Energy Use and Demand 1979 - 1993 Planning Department, Report No.79-19, Detroit Edison, September 1978 Energy Conservation q.1 (September 22, 1978)

Project to demonstrate Potential Energy Savings from Industrial Customers, Federal Energy Administration, The Detroit Edison Company, and Michigan Public Service Commission, June 7, 1978 Residential Electricity Elasticities in the Lower Peninsula of Michigan, Volume 1, Equitable Environmental Health, Inc.,

July 1977 Experimental Domestic Time-of-Day Report, October 1976 -

September 1977, Rate Department, December 1977 Interruptible Air Conditioning Rate Filing, MPSC:

Testimony, Exhibits, Working Papers and Appendices, Case No. U-5200 Generic Hearings to Determine the Ef fectiveness of Interrupting Specified Electric Services with Respect to Load Management by Major Michigan Electric Utilities, Testimony and Exhibits Parts 1 and 2, Case No. U-5845 Testimony and Final MPSC Order - U-5174: Implementation of a Home Insulation Plan Application of the Detroit Edison Company for Authority to Implement a Customer Information Program - U-5914 MPSC Pronouncements in the Matter of the Establishment on the Commission's own Motion of Residential Conservation Program Standards - U-5900 System Reliability~

q.1 (September 22, 1978)

Electric Coordination Agreement between Consumers Power Company and the Detroit Edison Company q.3 (September 22, 1978)

Electricity Supply Agreement between Michigan Municipal Cooperative Power Pool and the Detroit Edison Company Benefits and Costs q.2 (September 22, 1978) q.1 (Novenber 30, 1978)

Computer Input, PROMOD III, Version 7.6 Cases 1, 2, 3, 4