ML19259B506

From kanterella
Jump to navigation Jump to search
Notification of 790227-28 Site Visit to Plainfield,In by Caseload Forecast Panel to Assess Status of Const.W/Encl Proposed Agenda
ML19259B506
Person / Time
Site: Marble Hill
Issue date: 02/06/1979
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 7903010323
Download: ML19259B506 (5)


Text

.

M UNITED STATES

'4,t NUCLEAR REGULATORY COMMISSION 2

j g-WASHINGTON, D. C,20555 y-g e

%,.....,l FEB 6 1979 Docket Nos:

STN 50-546 STN 50-547 MEMORANDUM FOR:

Steven A. Varga, Chief, Light Water Reactors Branch No. 4, DPM FROM:

Jerry N. Wilson, Project Manager, Light Water Reactors Branch No.

4, DPM

SUBJECT:

FORTI! COMING SITE VISIT AT THE MARBLE HILL NUCLEAR GENERATING STATION Date:

February 27 4 28, 1979 Location:

Construction site near Plainfield, Indiana

Purpose:

Site visit by Caseload Forecast Panel to assess the status of construction.

Proposed agenda is attached.

Participants:

NRC J. Wilson S. Kari B.

Lovelace E. Schweibinz et al.

Public Service of Indiana L.

Crews T. Burns et al.

ICl

. ((

/1 1

N.

'il s on, Project Manager Ligh,t Water Reactors Branch No. 4 Division of Project Management

Enclosure:

As stated cc:

See next page 7903010323

~

Public Service of Indiana Charles W. Campbell, Esq.

Michael J. Wal ro, Esq.

Vice President and General Counsel Attorney for the Planning Board and Public Service of Indiana the Board of Zoning Appeals of 1000 E. Main Street Jefferson County Plainfield, Indiana 46168 427 East Main Street Madison, Indiana 47250 Mr. William Kortier Atomic Power Distribution Mr. Robert C. Slover Westinghouse Electric Corporation Save the Valley, Inc.

P. O. Jox 355 P. O. Box 813 Pittsburgh, Pennsylvania 15230 Madison, Indiana 47250 Mr. R. J. Suslick Walker C. Cunningham, Jr., Esq.

Sargent & Lundy Engineers 1129 Kentucky Home Life Building 55 East Monroe Street Office of the Jefferson County Attorney Chicago, Illinois 60603 Louisville, Kentucky 40202 Harry H. Voigt, Esq.

David K. Martin, Esq LeBoeuf, Lamo, Leiby & MacRae Assistant Attorney Generals 1757 N Street, N. W.

Room 34, State Capitol Washington, D. C.

20036 Frankfort, Kentucky 40601 George A. Leininger, Jr., Esq.

David R. Vandenventer, Esq.

City Attorney, City of Madison Jefferson County Consumer P. O. Box 826 Protection Department Madison, Indiana 47250 401 Old Louisville Trust Building Louisville, Kentucky 40202 Mr. Rooert Gray Rural Route #1 Bill V. Seiller, Esq.

Hanover, Indiana 47243 Ewen, MacKensie and Peden 21e0 Commonwealth Building J. Bruce Miller, Esq.

Louisville, Kentucky 40202 Jefferson County Attorney 1129 Kentucky Home Life Building Ms. Marie Horine, President Louisville, Kentucky 40202 Save Marble Hill Rural Route #2 Ted R. Todd, Esq.

Lexington, Indiana 47138 Attorney for the Board of Commissioners of the County Mrs. David G. Frey of Jefferson, Indiana Indiana Sassafras Audubon Society 427 East Main Street 2625 S. Smith Road Madison, Indiana 47250 Bloomington, Indiana 47401 Tnomas M. Dattilo, Esq.

Mr. Ralph C. Pickard Matford & Dattilo Indian State Board of Healtn 404 East Main Street 1330 West Michigan Street Madison, Indiana 47250 Indianapolis, Inoiana 46205 Joseph B. Helm, Esq.

Mr. Donald L. Cox Brown, Todd & fieyourn Assistant Director of Law Sixteenth Floor City of Louisville Citizens Plaza 200 City Hall Louisville, Kentucky 40202 Inuisville, Kentucky 40202

Public Service Company of Indiana, Inc.

ccs (continued) fir. Richard S. Salzman, Chaimm Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. John II. Buck Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Flichael Farrar Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. James Coughlin Vice President - Nuclear Public Service of Indiana 1000 E. Main Street Plain field, Indiana 46168

MARBLE HILL PROPOSED AGENDA FOR CASELOAD FORECAST PANEL MEETING February 27-28, 1979 February 27th 9:30 a.m.-3:30 p.m.

1.

Overview of construction management organization and activities.

2.

Overview of project construction schedule including major milestones and schedule for licensing.

3.

Procurrement management and current status of major components including hangers, snubbers, pipe whips, valves, piping and etc.

4.

Construction status and problems including bulk quantities (Total estimate cuantity and quantity installed to date.), status of HVAC work.

A.

Concrete B.

Structrual Steel C.

Large Bore Pipc - 2 " i D.

Small Bore Pipe - 2" 4

E.

Hangers, Snubbers etc.

F.

Cable Tray G.

Conduit H.

Cable I.

Terminations 5.

Engineering organization and current status of design /

engineering activities.

6.

Actual and proposed craf t work force, craft availability, productivity, potential labor negatiations and problems.

7.

Current status of pre-op test procedure writing and integration of pre-op testing with construction schedule.

Pre-op test schedule and number of engineers writ ing procedures and performing pre-op test.

8 Construction scheduling staff:

A.

Method of calculation of percent complete.

B.

Method of monitoring rate of completion, identifying critical path items and implementation o f corrective actions.

C.

Critical path activities, logic network and computer printout of critical and/or near critical items.

,9,.

. February 28th 9:30 a.m.-2:00 p.m.

Tour Marble 11i11 site to observe construction activities and present NRC str.ff conclusions.

.