Category:CORRESPONDENCE-LETTERS
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability ML20217A5911999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics ML20212J7431999-09-30030 September 1999 Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel ML20212K7651999-09-29029 September 1999 Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation ML20212D5771999-09-15015 September 1999 Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl ML20211Q6451999-09-0808 September 1999 Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam ML20211Q4171999-09-0606 September 1999 Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump ML20211K5261999-08-31031 August 1999 Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted ML20211F6941999-08-27027 August 1999 Provides Individual Exam Results for Applicants That Took Initial License Exam in July & August of 1999.Completed ES-501-2,copy of Each Individual License,Ol Exam Rept, ES-303-1,ES-303-2 & ES-401-8 Encl.Without Encl NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months ML20211E8791999-08-24024 August 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Point Beach Nuclear Power Plant,Units 1 & 2.Licensees Provided Requested Info & Responses Required by GL 96-01 ML20211F1501999-08-24024 August 1999 Submits Summary of Meeting Held on 990729,in Region III Office with Util Re Proposed Revs to Plant Emergency Action Level Criteria Used in Classifying Emergencies & Results of Recent Improvement Initiatives in Emergency Preparedness 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached ML20210L9141999-08-0404 August 1999 Informs That Versions of Info Re WCAP-14787,submitted in 990622 Application for Amend,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210K5221999-08-0404 August 1999 Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 ML20210G6011999-07-30030 July 1999 Discusses 990415 Complaint OSHA Received from Employee of Wisconsin Electric Power Co Alleging That Employee Received Lower Performance Appraisal for 1998 Because Employee Raised Safety Concerns While Performing Duties at Point Beach NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal ML20210H0211999-07-28028 July 1999 Forwards Insp Repts 50-266/99-09 & 50-301/99-09 on 990528-0713.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210G2441999-07-26026 July 1999 Discusses 990714 Meeting with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 ML20209H5471999-07-14014 July 1999 Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20196J4161999-06-30030 June 1999 Discusses Relief Requests Submitted by Wisconsin Electric on 980930 for Pump & Valve Inservice Testing Program,Rev 5. Safety Evaluation Authorizing Relief Requests VRR-01,VRR-02, PRR-01 & ROJ-16 Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions ML20196D4931999-06-18018 June 1999 Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good ML20195J9471999-06-16016 June 1999 Discusses Ltr from NRC ,re Arrangements Made to Finalized Initial Licensed Operator Exam to Be Administered at Point Beach Nuclear Plant During Week of 990726 ML20196A2931999-06-16016 June 1999 Ack Receipt of Transmitting Changes to Listed Sections of Point Beach Nuclear Plant Security Plan & ISFSI Security Plan,Submitted IAW 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness ML20195J9251999-06-14014 June 1999 Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 ML20206T3691999-05-17017 May 1999 Ltr Contract,Task Order 242 Entitled, Review Point Beach 1 & 2 Conversion of Current TS for Electrical Power Systems to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20206N5561999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Point Beach Npp.Organization Chart Encl ML20206P2551999-05-12012 May 1999 Forwards Handout Provided to NRC by Wisconsin Electric at 990504 Meeting Which Discussed Several Recent Operational Issues & Results of Recent Improvement Initiatives in Engineering ML20206N5331999-05-12012 May 1999 Forwards RAI Re & Suppl by Oral Presentation During 980604 Meeting,Requesting Amend for Plant,Units 1 & 2 to Revise TSs 15.3.12 & 15.4.11 ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure ML20206K0391999-05-0707 May 1999 Forwards Insp Repts 50-266/99-06 & 50-301/99-06 on 990223- 0410.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure NPL-99-0242, Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage1999-04-27027 April 1999 Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage NPL-99-0246, Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl1999-04-27027 April 1999 Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl ML20206C2361999-04-22022 April 1999 Forwards 1998 Annual Rept to Stockholders of Wepc Which Includes Certified Financial Statements,Per 10CFR50.71 NPL-99-0230, Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC1999-04-19019 April 1999 Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic1999-04-16016 April 1999 Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italics NPL-99-0219, Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire1999-04-15015 April 1999 Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire 05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i1999-04-0808 April 1999 Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept NPL-99-0174, Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 9807141999-03-30030 March 1999 Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 980714 ML20206B8231999-03-30030 March 1999 Forwards Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981103 for Point Beach Power Plant.One Deficiency Identified for Manitowoc County.County Corrected Deficiency Immediately NPL-99-0177, Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.751999-03-30030 March 1999 Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.75 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics1999-03-10010 March 1999 Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics NPL-99-0122, Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 &1999-03-0303 March 1999 Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 & 2 NPL-99-0111, Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months1999-03-0303 March 1999 Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months NPL-99-0116, Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld1999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld NPL-99-0115, Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 21999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0114, Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage1999-02-25025 February 1999 Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure1999-02-24024 February 1999 Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure NPL-99-0101, Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld1999-02-19019 February 1999 Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld ML20203F7301999-02-10010 February 1999 Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld NPL-99-0067, Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 21999-02-0202 February 1999 Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 2 NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement1999-02-0202 February 1999 Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld1999-01-27027 January 1999 Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld 05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications1999-01-26026 January 1999 Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr1999-01-15015 January 1999 Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr NPL-99-0004, Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 21999-01-11011 January 1999 Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0012, Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld1999-01-0808 January 1999 Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H9391990-09-13013 September 1990 Forwards Amended Response to Notice of Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Action: Revised Procedures Will Not Be Issued Until After Unit 2 Refueling Outage.Other Changes Anticipated by 901231 ML20059G7211990-09-0505 September 1990 Responds to Generic Ltr 90-03, Vender Interface for Safety- Related Components. Implementing Formal Vendor Interface Program for Every safety-related Component Impractical ML20028G9071990-08-31031 August 1990 Advises That long-term erosion/corrosion-induced Program for Pipe Wall Thinning in Place,Per Generic Ltr 89-08.Program Assures Erosion/Corrosion Will Not Lead to Degradation of Single & two-phase High Energy Carbon Steel Sys ML20059G8741990-08-31031 August 1990 Forwards Revised Security Plan,Per NRC .Summary of Revs Listed.Rev Withheld (Ref 10CFR3,50,70 & 73) ML20064A4711990-08-29029 August 1990 Forwards Semiannual Monitoring Rept,Jan-June 1990, Rev 1 to Process Control Program, Rev 7 to Environ Manual & Rev 5 to Odcm ML20058N6771990-08-0303 August 1990 Forwards Public Version of Revised Procedures to Emergency Plan manual.W/900813 Release Memo ML20058L1471990-08-0303 August 1990 Responds to NRC Re Weaknesses Noted in Insp Repts 50-266/90-201 & 50-301/90-201 Re Electrical Distribution. Corrective Actions:Design Basis Documentation Will Be Developed to Alleviate Weaknessess in Diesel Generators ML20058L5041990-07-30030 July 1990 Discusses & Forwards Results of fitness-for-duty Program Performance Data for 6-month Period Ending 900630 ML20055J2031990-07-25025 July 1990 Responds to NRC Bulletin 89-002 Re Insp of safety-related Anchor/Darling Model S350W Check Valves Supplied w/A193 Grade B6 Type 410 SS Retaining Block Studs.Studs Visually Inspected & No Cracks Found ML20055H7781990-07-24024 July 1990 Forwards Corrected Monthly Operating Rept for June 1990 for Point Beach Unit 2.Correction on Line 18 Regards Net Electrical Energy Generated ML20055H6621990-07-23023 July 1990 Forwards Central Files & Public Versions of Revised Epips, Including Rev 2 to EPIP 1.1.1,Rev 16 to EPIP 4.1,Rev 6 to EPIP 6.5,Rev 20 to EPIP 1.2,Rev 8 to EPIP 6.3,Rev 0 to EPIP 7.3.2,Rev 10 EPIP 10.2 & Rev 11 to EPIP 11.3 ML20058K8941990-07-23023 July 1990 Forwards June 1990 Updated FSAR for Point Beach Nuclear Plant Units 1 & 2.Steam Generator Upper Ph Guideline in Table 10.2-1 Changed from 9.3 to 9.4 ML20044A9091990-07-0606 July 1990 Responds to NRC Bulletin 90-001 Re Loss of Fill Oil in Transmitters Mfg by Rosemount.None of Listed Transmitters Installed at Plant in Aug 1988 Identified as Having High Failure Fraction Due to Loss of Fill Oil ML20055D4421990-07-0303 July 1990 Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 1,1990, Summary Rept ML20055D3471990-06-29029 June 1990 Provides Addl Response to Bulletin 88-008, Thermal Stresses in Piping Connected to Rcss. Engineering Evaluations Performed to Assure Code Compliance Due to Unanalyzed Condition of Thermal Stratification Addressed ML20055D6221990-06-29029 June 1990 Provides Suppl to Re Loss of All Ac Power.Test Demonstrated That Ventilation Mod & Recalibration of High Temp Trip for Auxiliary Power Diesel Improved Performance of Gas Turbine Generator as Alternate Ac Source ML20055D2291990-06-22022 June 1990 Informs NRC That Gj Maxfield Promoted to Plant Manager effective,900701 ML20055D6231990-06-22022 June 1990 Advises of Decision to Proceed W/Leak Testing of Sys During Plant Refueling Outage Due to Delay in Delivery of Gamma-Metrics Hardware Fix Kits.Test Revealed That Both in-containment Cable & Detector Assembly Cable Had Leaks ML20044A0011990-06-18018 June 1990 Provides Current Implementation Status of Generic Safety Issues at Plant,In Response to Generic Ltr 90-04 ML20043D6511990-05-25025 May 1990 Discusses Cycle 18 Reload on 900519,following 7-wk Refueling & Maint Outage.Reload SER for Cycle 18 Demonstrates That No Unreviewed Safety Questions,As Defined in 10CFR50.59, Involved in Operation of Unit During Cycle ML20043B1481990-05-18018 May 1990 Advises That Necessary Info Received from Westinghouse Re Revised Administrative Controls for NRC Bulletin 88-002, Rapidly Propagating Fatique Cracks in Steam Generator Tubes. ML20043B1101990-05-17017 May 1990 Documents Status of Evaluations Committed to Be Performed Re IE Bulletin 79-14 Program.Support CH-151-4-H50 Modified During Unit 1 Refueling Outage & Now in Code Compliance. Meeting Proposed During Wks of 900618 or 900716 ML20043A9921990-05-16016 May 1990 Advises of Typo in Item 2.C Re Emergency Diesel Generator Meter Accuracy in Submittal Re Corrective Actions in Response to Concerns Identified During Electrical Insp.Meter Calibr Reading Should Be 3,050 Kw Not 350 Kw ML20043B0481990-05-16016 May 1990 Updates 890330 Response to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Util Will Replace Unit 1 Inverter & Battery Charger Circuit Breakers within 30 Days After Receipt & QA Verification ML20043A7631990-05-15015 May 1990 Responds to Notice of Violation & Forwards Civil Penalty in Amount of $87,000 for Violations Noted in Insp Repts 50-266/89-32,50-266/89-33,50-301/89-32 & 50-301/89-33. Addl Employees Added in QA & Corporate Nuclear Engineering ML20042H0201990-05-10010 May 1990 Forwards List of Concerns Identified at 900417 Electrical Insp Exit Meeting to Discuss Preliminary Findings of Special Electrical Insp Conducted on 900319-0412 Re Adequacy of Electrical Distribution Sys ML20043A2181990-05-10010 May 1990 Forwards Nonproprietary & Proprietary Version of Point Beach Nuclear Plant,Emergency Plan Exercise,900314. ML20042G7441990-05-0909 May 1990 Forwards LER 90-003-00 ML20042G7361990-05-0808 May 1990 Forwards LER 90-004-00 ML20042E4571990-04-10010 April 1990 Documents Basis for Request for Temporary Waiver of Compliance of Tech Spec 15.3.7.A.1.e Re Diesel Generator Fuel Oil Supply ML20012F2961990-03-29029 March 1990 Withdraws Tech Spec Change Request 120 Re Staff Organization Changes & Deletion of Organizational Charts,Based on Further Corporate Restructuring within Util ML20012D8301990-03-20020 March 1990 Responds to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. No Limiting Condition for Operation Required for Overfill Protection Sys at Plant ML20012D4241990-03-0808 March 1990 Forwards Public Version of Revised Epips,Including Rev 17 to EPIP 1.3,Rev 8 to EPIP 3.1,Rev 15 to EPIP 4.1,Rev 1 to EPIP 6.7,Rev 1 to EPIP 7.1,Rev 11 to EPIP 7.2.1 & Rev 11 to EPIP 7.2.2 ML20011F7531990-02-26026 February 1990 Informs NRC of Apparent Inconsistency Between Min Level of Boric Acid Solution to Be Maintained in Boric Acid Storage Tanks Per Tech Specs & Amount of Deliverable Boric Acid Assumed in Safety Analyses ML20006B7091990-01-25025 January 1990 Responds to NRC Bulletin 89-002 Re Check Valve Bolting Insp. All Anchor-Darling Model S35OW Check Valves Inspected for Cracked Internal Bolting During Refueling Outage of Unit.No Indications of Cracks Found ML20006A3381990-01-18018 January 1990 Forwards PDR & Central Files Versions of Rev 16 to EPIP 9.2 & Forms, Radiological Dose Evaluation. ML20006A3411990-01-16016 January 1990 Forwards Rev 16 to EPIP 9.2, Radiological Dose Evaluation to Be Inserted in EPIP Manual ML20005G0901990-01-12012 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Outside of Intake Structure Will Be Inspected for Excessive Corrosion on Semiannual Basis & Forebay & Pumphouse Inspected ML20005G1751990-01-12012 January 1990 Responds to NRC 891213 Ltr Re Violations Noted in Insp Repts 50-266/89-30 & 50-301/89-30.Corrective Action:Procedure RP-6A, Steam Generator Crevice Flush (Vacuum Mode), Initiated ML20005H0551990-01-11011 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Util Will Provide Specific Training to All Members Responsible for Refueling Operation to Emphasize Importance of Procedures ML20005G9031990-01-0909 January 1990 Forwards Monthly Operating Repts for Dec 1989 for Point Beach Nuclear Plant Units 1 & 2 & Revised Monthly Operating Rept for Nov for Point Beach Unit 2 ML20005G5641990-01-0808 January 1990 Updates Progress Made on Issues Discussed in Insp Repts 50-266/89-12 & 50-301/89-11 Re Emergency Diesel Generator Vertical Slice SSFI Conducted by Util.By Jul 1990,revised Calculation Re as-built Configuration Will Be Performed ML20005E5441989-12-29029 December 1989 Describes Actions & Insps Completed During Recent U2R15 Refueling Cycle & Proposed Schedule for Completion of NRC Bulletin 88-008 Requirements,Per Util 881221 & 890616 Ltrs. Extension Requested Until 900631 to Submit Data Evaluation ML20005E5451989-12-28028 December 1989 Advises That Addl Info Required from Westinghouse to Meet Util 890621 Commitment to Adopt Administrative Control Re Rapidly Propagating Fatigue Cracks in Steam Generator Tubes Per NRC Bulletin 88-002.Info Anticipated by End of Mar 1990 ML20005E5381989-12-27027 December 1989 Provides Update of Status of Implementation of Resolution of Human Engineering Discrepancies Documented During Dcrdr. Lighting Intended to Document Deficiencies Per NUREG-0700, Eleven Human Engineering Discrepancy Computers Resolved ML19354D5781989-12-21021 December 1989 Certifies Implementation of Fitness for Duty Program Which Meets Requirements of 10CFR26 for All Personnel Having Unescorted Access to Plant Protected Areas.Periodic Mandatory Random Chemical Testing Will Commence on 900103 ML20005D8071989-12-21021 December 1989 Forwards Response to Violations Noted in Insp Repts 50-266/89-29 & 50-301/89-29.Response Withheld (Ref 10CFR73.21) ML20005E2301989-12-21021 December 1989 Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 2, Summary Rept,Per 10CFR50,App J.Type A,B & C Leak Test Results Provided ML20042D2391989-12-21021 December 1989 Responds to Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Actions:Superintendent of Health Physics Discussed Log Book Entry Requirements W/Health Physics Contractor Site Coordinator ML19354D6231989-12-15015 December 1989 Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Intends to Meet All Recommendations Discussed in Ltr Except for Item C Re Changing motor-operated Valve Switch Settings 1990-09-05
[Table view] |
Text
'
WISCONSIN Electnc POWER COMPANY 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 February 5, 1979 Mr. Jerome Saltznian, Chief Antitrust and Indemnity Group Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Saltzman:
Re: Document Nos. 50-266 and 50-301 Enclosed are copies of the following endorsement to the Secondary Financial Protection Binders written in connection with the Wisconsin Electric Power Company Point Beach Nuclear Plant:
Endorsement No. 3 to NELIA Binder Nos. EB-18 and EB-10 extending the Secondary Financial Protection for the year 1979.
Endorsement No. 3 to MAELU Binder Nos. XB-18 and XB-19 extending the Secondary Financial Protection for the year 1979.
Very truly yours, g' V %, cw W. J. Dundas Superi endent Insurarice and Claims Division WJD/ca Enc.
cc: Mr. A. W. Finke h 0\
\' ' 0 '7 t\
'7902090275- /)
4
. Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION
- 1) AM UAL PREF!IUfi Ef CCRSEMEllT
- 2) SUESCRIBIf;G C0fiPANIES AfiD THEIR PRO-PORTI0 MATE LIABILITY EfCORSEMEllT Calendar Year 1979
- 1. AftflUAL PREF 11Ufe- It is agreed that the Annual Premium due the companies for the period designated above is: $ 4,650.00 .
- 2. It is agreed that with respect to (i) bcdily injury or property darage caused, during the efective period of this encorsenent, by the radioactive, toxic, explosive or other hazardous properties of nuclear material, and (ii) ccntingent liability as provided in Condition 4 for excess incurred losses because retrospective premium due under one or more binders with respect to such bodily injury or procerty darage is not paid:
- a. The word " companies" wherever used in the policy means the subscribing corpanies listed on the reverse side of this endorserent.
- b. The policy shall be binding on such companies only.
- c. Each such ccmpany shall be liable only for its proportion designated next to its name of any obligation assured or expense incurred under the policy.
- 3. It is acreed that the effective period of this endorsement is frcm the beginning of the effective date of this endorsement stated belou, to the close of Decerber 31st of the Calendar Year designated in the capticn above, or to the time of the termination or cancellation of the Draft fiaster Policy, or this binder, whichever first occurs, eastern standard time.
(see reverse side for list of subscribing companies)
This is to certify that this is a true copy of the original Endorsement having the endorsement
\ made part of the binder for insurance coverage under the DRAFT MASTER POLICY-number NUCLhAR EN an2G1 beiyLTABILITY POLICY (Secondary Financial Protection) as designated No der.
Idsura'dn' e i I dfforbedhere
\' sJ Charlep g Ba des,iVice Presi: dent-Liability Underwriting, American Nuclear Insurers WrectiveiQate ot N slanuary I,1979 this Endokemenh \ To form a part of Binder fio. EB- 18
, \ 12:01 A.M. Stan ard Tirne issued to Wisconsin Electric Power Oompany
\
Date of issue._._danuiry 12. 1979
~
For the su scribing cor panies (Q Q/ 9 By ) N _
I " GenertHAanager Endors(ment No 3 Countersigned by ___
SLEC2:?"*1 C#woa9its PR^DrQT 'I C F 1**
Aetra Cassalty aad 5srety Co.< Tre.151 Faretactvi Ave . Mart *ocd. CT 06156 10.114073 Aetra Insur arte Cycany. 55 E T* 5t. . rart'ord CT C6115 2.525520 Allstate lesurnace Co.. Allstate plaza. hortrbrock. IL 60C62 4.214199 Avrican rcre Assurarce Co.,102 P'a teen La. hew York. F.f 10005 .834122 Arerican Fot:rists Irsura ce Co., Lero Grove. IL 60049 42142 G Sitricows Cas.alty Cor;cration. 32013tn St.. Fock Island. IL 61201 421420 Centeanial Insurance Co. 45 mall St.,
.579452 Correccial triun Insu arca r Co. . Cre Beaten S t. ,, Bes t:n. *A C2103 3.C34224 Connectiewt Irae et ty Cs gany. The.1000 Asylari Ave. . Partford CT C6101 1.011403 Contire-tal Casaalty Co.. CNA Plaza. Cnicaco. IL 60635 4.214I99 Conttreatal Irsuraece Co.. Tre. 80 Faicea La. . %ew York. %Y 10C38 6.742719 Federal !asenece Co., 51 Jcen F. Keare:p Ft-y. . SNrt !*tils. NJ O'073 1.517112 Fire an's Fued las rance Co. 3333 Call':enta St., San Francisco, CA 94119 5.057039 Geaeral Acciteet Fire and Life Assurarce Corp. , Ltd.. Fourte & balnat Sts. .
P911adel:*ta, sa 19105 1.343544 Great L-erican tasa r aece Co., 530 Walr u t it. Cincinaatt CH 45201 1.343544 Harover Msgraece Co. . Tee, 40 Lincoln S t., .e rc e s t e r., "A 01605 .505704 Partdora acciceat aac Ince-nity Co.t r' art'ord Fiaza. Part':ro. CT 06115 7.164139 Nart forJ 5 team Botier Inso.1 Irs. Co. . i*e. 56 Prce act St.. Hartf:rd. CT C6102 .505704 Hoee Irceent!y Co. T*e. 59 wa tcen La., sew fore. NY 10033 L 7084 M lesuraace Co. of *:crtai Areetta 1600 Arc'i 'treet, Fmtla:eionia. PA 19101 3.371359 Moa.aren Inswrance Co. of CPie. The.19 Fe: tor St.. New va ra . 'if 100C6 .337136 hort*ern nsarnace (c-pany cf New York. 5) Jcen Street, hev rcet, hY 1C038 1.854243 hort .estera haticeal :ns. Co. , 731 "o. Jackson 5! *11=a usee. .! 53201
. .674:72 Chio tasaalty Irsurance C:-cary. Tre.136 Norts intra St.. Hamiten. CH 45025 .158553 Pacific Nce-nity Co. 3200 m' ilsMre 61v1 Los Anceles. CA 90010 .337135 Peerless insarance Co. 62 Faote Ave., reeae Y4 ~C34;1 .1 E4M Phoe n t : Assurarce Co. of New 'cek . CO *a t een La. ., sew Yort . 4Y 10033 .505'04 Preteni ve :esuraace Co. 3100 No. *ert s'an St. , ndia-acolis. :1 46209 .163563 Provice-ce aasnington :nsurance Co., 20 kasotrgt:n Piare. Provtce ce. Al C2503 .105355 Purt t s n irsrance Cortaay,1515 Se-er st.< 'tarf:rc. CT C6905 .ES2552 Reliance Irsur>rce Corcany. 4 Pean Center Plaza. Fhildelcnta. P4 19103 1.491527 Royal Gloee :nsurance Carcacy 150 htilia* Street,, New f ort, f.Y 10038 3.371359 St Paal Fire & Partee Ins. Co. < 385 Wasnte;;:n 5' , St. Paul . "'i 551C2 4.773845 Seabcard Su r ety Co.o 90 iiill f a, S t. . New vera. 47 _10033 4214:0 State Farm Fire & Casualty Corca97.112 f ast 'aasnirgtan 5t. 81ccetnit:n. IL 617Cl .84:20 Transa erice :nsursece Co., IM So, 01t ve St.., Les Acceles. 0A 9CO 5 .8425 0 Trave;ers tece-nity Cars;any. T*e. Cre Tc=+r !cuare, rart'ord, CT 06115 10.956917 Lnite3 States Ficelity a*d Coacanty Co. 200 Lignt Street. Baltimre. "O 212'2 10.118073 United Sta tes Fire Insuraace Co., *'adisia Ave. , at Canf teld Ed. *arrt stown MJ 07950 2.697088 Zurich Irssraare Co. 111 best Jackson Blvd., CPicago. IL 60f C4 1.204260 NE-79
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS
- 1) ANNUAL PREMIUM ENDORSEMENT
- 2) SUBSCRIBI .G COMPANIES AND TIIEIR PROPORTIONATE LIABILITY Ei:DORSEMENT Calendar Year 1979
- 1. ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $1,350.00.
- 2. It is agreed that with respect to (i) bodily iniury, or property damace caused, during the effective period or this endorsement, by the radioactive, toxic, explosive or other hazardous properties of nuclear material, and (ii) contingent liability as provided in Condition 4 for excess incurred losses because retrospective premium due under one or more binders with respect to such bodily injury or property damace is not paid:
- a. The word " companies" wherever used in the policy means the subscribing companies listed on the reverse side of this endorsement.
- b. The policy shall be binding on such companies enly.
- c. Each such company shall be liable only for its proportion designated next to its name of any obligation assumed or expense incurred under the policy.
- 3. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this enciorsement stated below, to the close of December 31st of the Calendar Year designated in the caption above, or to the time of the termination or cancellation of the Draft Master Policy, or this binder, whichever first occurs, castern standard time.
Effective Date of this Endorsement January 1, 1979 To form a part of Binder No. vp _1 g 12: 01 A.M . Standard Time Issued to Wisconsin Electric Power Company Date of Issue December 22, 1978 By fM Endorsement No. 3 Countersigned by
Subscribing Companies PROPORTION OF 100%
American Mutual Liability Insurance Company, Wakefield, MA 15.0000000 Employers Mutual Liability Insurance Company, Wausau, WI 15.0000000 Liberty Mutual Insurance Company, Boston, MA 30.0000000 Lumbermens Mutual Casualty Company, Long Grove, IL 30.0000000 Michigan Mutual Insurance Company, Detroit, MI 5.0000000 Sentry Insurance, A Mutual Company, Stevens Point, WI 5.0000000 This is to certify that this is a true copy of the original endorsement, bearing the number designated hereon, for insurar.ce coverage under the DRAFT MASTER POLICY -
NUCLEAR ENERGY LIABILITY POLICY (Secondary Financial Protection) dated June 24,1977. No insurance is afforded by this copy.
.h L$
Muhdal Atomic Energy Liability Underwriters
Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION
- 1) Aht;UAL PREF!IUf1 E!!DCESEMEllT
- 2) SUBSCRIBIf;G C0!1PANIES A!!D THEIR PRO-PORTIONATE LIABILITY ENCORSEMEllT Calendar Year 1979
- 1. ANNUAL PREMIUf': It is agreed that the Annual Premium due the companies for the period designated above is: $ 4,650.00 .
- 2. It is agreed that tiith respect to (i) bcdily injury or procerty damage caused, during the efective period of this encorsenent, by the radioactive, toxic, explosive or other hazardous properties of nuclear material, and (ii) ccntingent liability as provided in Condition 4 for excess incurred losses because retrospective premium due under one or core binders with respect to such bodily injury or prccerty darace is not paid:
- a. The word " companies" wherever used in the policy means the subscribing companies listed on the reverse side of this endorsement.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable only for its proportion designated next to its name of any obligation assumed or expense incurred under the policy.
- 3. It is acreed that the effective period of this endorsement is frcm the beginning of the effective date of this endorsement stated below, to the close of December 31st of the Calendar Year designated in the capticn above, or to the time of the termination or cancellation of the Draft t' aster Policy, or this binder, whichever first occurs, eastern standard time.
(see reverse side for list of subscribing companies)
This is to certify that this is a true copy of the original Endorsement having the endorsement nurtberta , being ::ade part of the binder for insurance coverage under the DRAFT MASTER POLICY-UUGLEAR ENERGY LIGILITY POLICY (Sa:ondary Financial Protection) as designated hereon. No i
lnsur$nceisaffq'rd@hereudder.
\) g -
\ ,
(Charges}R( Bhrdes, Vic revd,d; ent-Liability Underwriting, American Nuclear Insurers tEsMhe$ \_ January 1, 1979 To form a part of Binder No. EB- 19
. \ 12 01 A.M. Standard Time issued to MI5Qohsin Electric Power Company
- Date of Issue Janu i 12. 1979 For the su4:.co' bin 9 par By
}
v General Manager Endorsement No 3 countersigned by ___
9
$t Mc't !:'", raue s'. !E S PO CN CF 1*C5 Aetra Casualty aad $srety Co. , T*e,151 Farriestin Ave. . Partfees, CT C6156 10.114073 Aetea las rance Ccccany. 55 E!* 5t. . Part f ord, CT C6115 2.523523 Pl! state Ir.sgraace Co., Alistate Piara. ". ort *Drock, IL 6006? 4.2141i9 Fe-tcan ec*e Assurance Co. 102 FJicen La. ., f.e= Vork. NY 10C05 .384982 American Potarts ts Insurance Co.. Loeo Crove. !! 60C4 9 42I42G Bitaneou. Cas alty Cer;oratice, 323 f ats 5* , 8 ck Islaad, IL 61201 421420 Centennial Iesuraace Co.o 45 hall S t. , *.e. vert , NY 10005 .579452 Correrctal Lnie !nsara*ce Co., Cne Beacon it., Scsten FA C2103 3.034224 Connecticat Inde-nity Co-caav, Tee,1003 Asylun Ave. . Hart ford, CT C6101 1.C11403 Ccetireatal Cas.alty Co.. C'.A Pla:a, CP.icaco, IL 60635 4.214199 Contineatal Insarsace Co., 'Pe, 23 Patte* Lt., ' ew f ort, NY 10C33 6.742719 Fece-al Ins acarce Co. ,, 51 Jcen F. rear *3 Pk.y. , Short Mills, NJ 07073 1.517112 Fire-W s Fu ad lasora*ce Co., 3333 Ca11'ernia St.< San Francisco. CA 94119 5.057039 General acctreat Fire a*d Li'e Assurance Corp., Ltd., Fowe '* 1 Walnut 5ts.,
Peif acel:nta, FA 19:05 1.3?3544 Great kee'can Insu rance Co., *0 Walrut St , Cincinnati, OH 45001 1.342544 Harover !assraece Co., ~Pe, 440 Lincol- St. , .c re e s t e r . FA 01605 .505:04 Far**1r$ Acetceet ans Ince et ty Co. , Martford Plaza.r' art'ord, CT 06115 7.164139 Part'ord Steam Baller Inso. & !as. Co., Tr.e, 56 Fros:ec* St. . Ha-t' ora, CT C61C2 .505704 Here ince-alty Co. . T*e. 69 Paices La. , Ne f ort, %Y 10033 3. 7C849 5 fesora*ce Co. of Nor:9 Are-tea,1603 Arc 9 Street. Fhtladelsnia, PA 191C1 3.371357 Mcaa rc e '*swr aace Co. of Chio. T*e,19 Sector St., New Yort, SY 10CC6
.337135 hort ern Insuraece Cc-:any of Ne= fort, 19 Jern Streets hew York. %Y 10038 1. 5512a 3 hert%esteen %aticcat Ins. Co. , 731 No. Jackson S t. , *ilma wkee, w! 53201 .674272 Chio Cas.alty lasurece Co cany, TPe.136 hor's Thtre it., Natiltcn, CH 45025 .1639a Pact'tc Inde-nity Co, ;200 wilsnire Elvd., Les Aegeles, CA 90010 .337136 Feeeless Irs.raacn Co. , 62 *a0!e E ve. , f eeae. h4 03431 .126426 Pacem a Assurance Co. of he, voce, 80 ra.cen ta., New fort, My 10033 .505'04 Prote:ttve Inswracce Co. , 3100 No. Pertaian St.o !catanscolis IN 46203 .16M63 Provicance nasntegtcn Imraace Co. , 23 ansni.'gt:n Piace, Provicerce, R! C2933 .105355 Purttan Insurance Carpary,1515 Surrer St., stamferd, CT C6905 .252352 ee liance Insur' ace CJ:any, 4 Peen Center "laza. Faticelchia, FA 19103 1.491527 Royal G!n'e Irssrance Cc cany,150 William Street, Se= York, fiY 10038 3.371359 St. Paal Fire & *artne ;as. Co. , 085 '.asnicqtan St. , S t. Paul, "N 55102 4.773345 Seat:ars brety Co., 93 Wilitam St., he= vers..NV 10033 4/1423 State Farm Fire & Casualty Ccreaay, 112 (ast hasntngt:n St., !?ce+tectos IL 61701 .842043 Transa-eetes Insurance Co. ,, 1150 50. Olive St Los Acceles, Cs 90015 .242E23 Travelers Mee-m ty Coreany, **e, Cre Tc er Scuare, ' art' orc, CT C6115 10.956917 1;niteo States F1celity and %aracts Co.,,10C L19"t Street. 9alttecre. 93 21202 10.114073 Pt tes States Fire Inseraace Co. , "adison Ave., at Canfield cd. k'orrist:=n, NJ 07950 2.697058 Zur$ch lanrme Co.,111 mest Jackscn Blvd., Chicago. !L 60604 1.254260 tie-79
Nuclear Fuergy Liability Insurance MUTUAL ATOMIC 1;NERGY LIABILITY UNDERWRITERS
- 1) ANNUAL PRFMIUM ENDORSEMENT
- 2) SUBSCRIBI.NG COMPANIES AND THEIR PROPORTIONATE LIABILITY EMDORSEMENT Calendar Year 1979
- 1. ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $1,350.00.
- 2. It is agreed that with respect to (i) bodily injury or property damace caused, during the effective period or this endorsement, by the radioactive, toxic, explosive or other hazardous properties of nuclear material, and (ii) contingent liability as provided in Condition 4 for excess incurrec losses because retrospective premium due under one or more binders with respect to such bociily injury or property damace is not paid:
- a. The word "corapanies" wherever used in the policy means the subscribing companies listed on the reverse side of this endorsement.
- b. The policy shall be binding on such companies only
- c. Each such compan'f shall be liable only for its proportion designated next to its narae of any obligation assumed or expense incurred under the policy.
- 3. It is agreed that the effective period of this endorsement is from the Leginning of the effective date of this endorsement stated below, to the close of December 31st of the Calendar Year designated in the caption above, or to the time of the termination or cancellation of the Draft Master Policy, or this binder, whichever first cccurs, eastern standard time.
Effective Date of this Endorsement January 1. 1979 To form a part of Binder No. XB -19 12: 01 A.M . Standard Time Issued to Wisconsin Electric Ibwer Company Date of Issue December 22, 1978 _
By Endorsement No. 3 Countersigned by
Subscribing Companies PROPORTION OF 100%
American Mutual Liability Insurance Company, Wakefield, MA 15.0000000 Employers Mutual Liability Insurance Company, Wausau, WI 15.0000000 Liberty Mutual Insurance Company, Boston, MA 30.0000000 Lumbermens Mutual Casualty Company, Long Grove, IL 30.0000000 Michigan Mutual Insurance Company, Detroit, MI 5.0000000 Sentry Insurance, A Mutual Company, Stevens Point, WI 5.0000000 This is to certify that this is a true copy of the original endorsement, bearing the number designated hereon, for insurance coverage under the DRAFT MASTER POLICY -
NUCLEAR ENERGY LIABILITY POLICY (Secondary Financial Protection) dated June 24,1977. No insurance is afforded by this copy.
A Mutilal Atomic Energy Liability Underwriters