D.tIItYLAND POWEll COUI*EILtTAVE Ba Crone, 0% nan 54601 January 31, 1979 In reply, please refer to LAC-6099 DOCl;ET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis L.
Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBUR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 FIRE PROTECTION REVIEW - ADDITIONAL INFORMATION
Reference:
(1)
DPC Letter LAC-6047, Linder to Ziemann, dated December 19, 1978.
Gentlemen:
Our response to staff positions on fire protection (Reference 1) committed to implementation actions and the submittal of further documentation related to this subject.
Staff Position P.2 - Smoke Detection Systems The test procedure is outlined in the memo and diagram,, to this letter.
Test results indicate that no modifications are necessary.
Staff rosition P.8 - Exterior Hose Houses The appropriate administrative controls are being prepared and will be implemented by March 1, 1979 instead of February 1, 1979 as previously stated in Reference 1.
Staff Position P.19 - Fire Pump Performance The full range tests scheduled for completion by April 1, 1979 were dependent on the commencement of the 1979 refueling outage prior to that date.
Due to capability limitations as a result of seal problems on one of the forced circulation pumps, it has been necessary to operate the plant at less than 50% power, thereby increasing the length of the present fuel cycle.
The refueling shutdown therefore has been delayed until April 1979 and the fire pump performance test will be accomplished during that outage.
790209025l
~
~
Mr. Dennis L.
Ziemann, Chief LAC-6099 Operating Reactors Branch #2 January 31. 1979 Staff Position P.22 - Fire Door Assemblies - Security Modifications The additional documentation attesting to the fire integrity of the security modification of door assemblies is contained in to this letter.
If there are any questions regarding this response, please contact us.
Very truly yours, DAIRYLAND PCWER COOPERATIVE
'g y b 4"
LV/
Frank Linder, General Manager FL:JDP:af Attachments cc:
J.
Keppler, Reg. Dir., NRC-DRO III
- 1 -
ATTACHMENT 1 JUNE 5, 1978 TO:
FIRE FILE (S2E)
FROM:
W.
R.
NOWICKI, INSTRUMENT & ELECTRICAL SUPERVISOR
SUBJECT:
SMOKE ALARM CHECK OBJECTIVE:
To determine if actual smoke source will alarm the fire detector being checked.
DETERMINE:
If air flow pattern may have changed in the area of detection so that smcke may be carried away from detection area.
PROCEDURE:
1.
Inform the Shift Supervisor of this alarm check.
2.
Use a metal can attached to an extension rod to contain the smoke source (ace attached diagram).
3.
Station one person at the alarm panel to acknowledge the alarm and record data, using the semi-annual Test Sheet (attached),
Place an "X" in the alarm number box if the alarm was received within 3 to 5 seconds after the smoke had reached the detector.
The smoke source will be placed in the approximate area being san. pled by the detector.
4.
The cmoke source will consist of smoldering, not flane burning, hemp rope and rags wrapped cround wire insulation material.
5.
Report all data and any notes on data sheet.
Inform Shift Supervisor at completion of this check.
CONCLUSION:
(6/8/78)
A check was completed on all fire detector heads to insure that flow patterns had not changed to cause an undetected fire.
Flow patterns in this plant have not been altered by installation of new equipment.
Fire detection equipment was engineered and tested in areas after the plant had been built and in operation for several years.
Most areas have little air circulation.
Where large air flowa exist, special high flow fire alarm units were installed, such as 3r,-duct detectors, The manufacturer had engineered and provided detailed prints for the proper location of the equipment that was installed.
After installation, the manufacturer's representative conducted system tests for each detector to determine propor operation.
The smoke test that was requested was completed and all fire alarms responded properly to the smoke signal provided.
It is my opinion that the system is ir. stalled properly.
- 8
\\
- M v W.
R.
Nowicki, Instrument Supervisor WRN:af cc:
R. Shimshak J. Gallaher J.
Parkyn File S2E, T5a m
m h
2-
f i.
a s.
N,.,
< L
... Af 4'*4l'V'"'
[l l *
!.y 1'
,,yAfdh,yMr/chg
_ g y y - g y Q - - -.
9
~
jl r..
- 1. ;_.t -
' r' 7 1.. :.,
- '
- M {
- a_ '.L.,l*
k$
['s..
- 1*.N."',*lIt'l
~
,s n..-
e
- m.,
o t >j
,,g,,
.f
_W.e-
+3.
df a, -
. 'S ' 4 4-.
e-1; hs},*.'.'.8
. $ I. 6.F'i,
."r..'.,.' ~l. *W k8 -[
."t,I(
.g*j se-2 4
n
.+s
,... +9 fag,.y m,
' k5 5
A.l
$b
},,
4 4,;,3..
7,
,. Pt."
,}',X TJ'<?.v,* $ 75.T4
~
1 tt...v
-m
\\
l*.,
~
'. a '.
p s[,,:., *.. ~ 1
. s f. F-Q, ]:*1 -*b t'? '. -
y'
,7,..
. s... s.
g
- ,-q c; p t_
. L *."
- J -
a!
8-o g* w a < :
e, n.
NY*
r
%,. )
a.,
....e
,I
_ __ jfgg M
s s-m
.,. ~, - ' o.7.:,: f ait -;y:; ; - 5" J U N(c j 17 K
^ ??I i-A '::."A L T.ssT
-E U D-1
?
3 C
6 7
/i a
10 11 12 20 3 1
9 23::E 2_'
ZONE 3
dMX 2~
zoss sIMX 2
zm s ><X i:
zm zo:s f XD<D<
zma 8
ZOE 9_
7.O'3 10 30!2 ll,!
20KE 12 Z M 13 z0 3 l!?1
'7,073 1$
20;3 16
\\
^
ZONz 17
. Z O!G 18_
~
zee 1 MX X X XXLX X X X)<X e:
.M AA
)'
20:s 20_
_ng_ 1--
URBINE OIL TA!!K SPP.IhKU.R SYS1EM FTIM SVITCH
.2 IL S10 RAGE Rr0M SPP.IhKU'R SYS'IEM FIIM SWITCH V
?M
~
M><X
>CXXXXXXK M><X XXX><XX>(M mn
><XXW/fffAWM/Mn%%M ae n
>O<X X WAWMAW &&MffAM
-e n XXXXXX
>M
- 1 XX>CX><X-
~
W #/A DATE_phhg 4 ([ h
" b b g.M k. b M
ATTACHMENT 2 NUCLEAR ENERGY SERVICES, INC.
I NES DIVISION SHELTER ROCX ROAD DANBURY. CONN. 06810 (203) 744-3581 November 27, 1978 Reference No. NSS-157 Mr. Jefferson Gallaher Lacrosse Boiling Water Reactor Dairyland Power Cooperative P.O.
Box 135 Genoa, WI 54632
SUBJECT:
Fire Rating for Folger Adam 310-2 Door Strike Dear Jeff In accordance with your request, I have contacted the Folger Adam Cor.pany by telephone to establish whether a fire rating exists for their Model 310-2 electric door strike.
Mr. Larry Butts of Folger Adam stated that the 310-2 has been tested and qualified by UL for a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Class A fire rating.
The UL reference number for this rating is R-6667-1 and the control number is 267-R.
These UL listings are published as a set of file cards.
The door strike also has a Burglary listing under BP-1312, control number 233G.
s I am surprised that the Factory Mutual fireinspector does not have a set of these UL listing cards in his office.
Very truly yours NUCLEAR ENERGY SERVICES) INC.
NES Division DAE Otto E. Saalborn Director, Security Services OES:jg cc:
R.E. Shimshak R. Milos
i
~
RECD DEC 131978 l
$dfi Factory Mutual Engineering 3 d, % "f; g h Telcpbone (414) 771-8400 i
December 12, 1978 Te:ex 2-6636 Dairyland Power Cooperative "Reactorc Plant" Genoa, Wisconsin 54632 Attention:
Mr. Jeff Gallaher, Fire & Sec. Prot Supervisor RE:
Electric Strikes for Fire Doors Our Index No. 63h12.11 Our Account No. 2-05000
Dear Jeff:
This letter is in response to our earlier telephone conversations on the above referenced subject. You have installed electric strikes for the fire doors at your plant. The strikes are manufactured by the Folger Adam Co. of Joliet IL (Model 310-2).
Your concern was with a ec==ent made by the NRC that the strikes might "de-rate" the fire doors. The reaconing was that the strike may not be able to withstand the pressures generated during a severe fire on one side of the door. As I stated earlier, Factory Mutual has not performed any approval testing on elec-tric door strikes. HovcVer, Underwriters Laboratories has performed such testing.
I am enclosing a copy of page 23 of UL'.s approval listings showing that the strike described above is adequately designed for the use intended.
I hope that this will provide the infomation you requested. If you have any additional comnents and/or questions, please don't hesitate contacting me.
Sincerely, V4L.T b
Robert L. Turnquist, P..
Operations Supervisor Milvaukee District RLT/d1h
=
1 nur noien wCrmiinFs 2.3 Door Frames-Condnued u
. L Vaughan Walls. Inc., Los Angeles Calif. 90049 L L Alaiain unn f r a mes. StoJet N+ 4bt r*.
iwalled only in solil nr semisolid syream m ailh ard walk, far t se only with % lir tcp lat.cled.. 4.tv. 4 composite type do=>rs.
1 hiel Na. 4%.r.p. eta..ified u nder f ire p#r.
an.t labeled erecemn e.n eet.. hiel Na,
}
4MT. li-ted undee Fire Doer Frames, manufacture.1 hv Crneret Vecece Manufacturine Cn.
i Virginia Metal Products. Div. of The Gray Mfg. Co., Orange. Va. 22960 t h I
Wagner's Sons Co.. J. F., Louisville, Ky.
Wayne Mfg. Corp., Waynesboro. Va. 2298J I'
Western Ito!!aw Metal Co.. Inc., Raton. N. Mex. 8m0 Doulde egreas tire frame t*ravedet for use with thes manuf acNrer's d..uble egre.e do. r deo n n.
g Westmetal Hollow Metal Produsts Co., Salt Lake City'16. Utah.
Weyerhaeuser Cornpany. Tacoma. Was' 98401 F
%'.wl-enven ed enent.a ste ty pe trans..res panel. for se=e mieh lisied fire do r frames wi* h i
o
- i a tsaneam bar and I' m Itit e li t. I llR ilil. ear 1 ilk IC) latele.1 fire doors.
N Williamsburg Steel Products Co. Brooklyn, N. Y.11222 l
Zimmerman Architectural Metals, Inc Denver. Colo. 80215
{[}
Frame may he prosiacd with side lash.a or.iae parieta.
l V
1 HARDWARE (120 IDIG) GWCR I.
h' r.
trailders, rare dr=*r.
and eleva*nr d.=*
hardware f r di'Terent t ypes cif fire doors is 1,
introded to be lesenilet in accor.fance with the Stsn4 4* est the National Fire l'rotatinn As= mation for Fire Door = and w indo... NFI'A NA 18 0.
j The pr iteetien of an epenine depende r.nt only ugen the u-c of a labeled der ef the a
preper ts pe but alsa uren the use of inheled framco, laated hardwa c. and the irstallati A.
4 l'roepectn e u crs ahenil.i first ascertain frorn auth rnsco havner pr:4.tection w hicts type.
1
- ntmg. and listed clonir.g mechanisms are areeptable for any given h.mation.
1 lI b
Builders Hardware (120 ID16.2) GWTZ j l This li.t in g ecs ers f.re exit hardw a re, self-latching type f!ush an3 surface tolta.
y single.. too.. and three. point locks or :stches, and rnanual. type top and tettoun bolta g
for swinging fire doors.
g 9
_ Electric _ Strikes QXAY)
) j Eicetric striken are intended to replace the strike plate used in t.re d.wir f rames of de I,
sine:e n etp n er too seetw.n type. Fur a%tanal inforrnation see D.mer Frame., tiVST.
.I :
Electrie etrikre base been inventagated under nre esposure for u.e wit h fire decir frames Ij and fire d..sra having a rating up to on.l inclu. ling 3 hrs. L etrie striken have alen been j
k e 1 for electric feat ures fier devecca ta be u.ed in Cla., I or Cla.s 2 N E.C.
inve-t era'u=n ty eeument ary contact switrbibe tenetrised en:y when peh b uten is held 4'
c or r uise.
der rened s shall be useil with elect rie strike. for u,e = sth fire el+r framco and nre d.w>rs.
6 f.
E.
$ p~
h!cctsee strikes ave for w*e = sth eyisne rical or enortise type Intches h sis ing i.
e n
s.
s,.in. laLeh tu.Its w hen auCb latebes asa muunted in ningle am ong du..ts up to 4 IL ia
}
or iv[.
width and a it sa beicht.
LOOK FOR THE LISTING MARK e-a a
s
-a 4
p ll Folger Adam Co Joliet. Ill. 60u4 and
.t. for u-e m eh c3 tin.fiiral an.1 marti.e latches i
i Elect ric strike, St.wtet. 'lle.2.
2's.,.It e:
basear 8... and 2s.in latch t leerina the followere identeheatsovi etaenped an J I the on O
t nt,f ar phte t Eicetri.e st r.ike. F. as:.".ed,ly m-ment ary e.nntact s.N iiire venco.aca
. h. m i s, pie,ii.w.~. _, heid 4. p.e.
. h e a se u.c4
.t h eiect rie i. it e.
Von Duprin, Inc Indianapolis. Ind. 46225 g
)k se ar d eihe. "Ja.lel wel far m e e p h c> lie..ti eral an t mmti e latches having e 5._
g" Eae i
...e con lave h I.it= 1 liene.c r t he f.:1..e ier ele, t esica'e o stamt.e4..n the f ace date:
- E.e. t e p-.s t r ike. F. Fe e l.*-
I 9
Fire Exit Hardware (120 ID16.2.6) GXHX Ttie fiating eaver, 4evices for seinsing ere d< wire which ase is tended to f acilita te ti.e este e rrens e,f per no en the en.e of a mei,ency. They have leen inve.tivated from h..th 5 1 e for a nd par.ie protects..n vie = s nne. For I..tinue for panie beidware applicane.no enis.
b) nee the 1.al..eatorie.* Accident E.swipment IJat, f ar fire s.r..teet > n apsdica t ene only, see s:'
the infuemat> n secti.ma under the se her c't.sefirati..ma of flattders listdw eep, Fire Doore.
g., g binale s=ont le k. ne latches of entlie r the moetene or rien type with o-ia. latch Indte.
t J
hk and cr'her murfare sane.nie.1 oc re.nces!c t writical rod deviren, in ellp*i n..e m bi ses and co..rdisintore for use an t ire D.=.rs having a ratins up to and enclad ng a hre (eneens d/
i ather=ine n(ted in the individwal list.ngeE in serieral. Fire East liardeste devices are Q' #
A